网站大量收购独家精品文档,联系QQ:2885784924

工期延误下的工程索赔分析-建筑与土木工程专业论文.docx

工期延误下的工程索赔分析-建筑与土木工程专业论文.docx

  1. 1、本文档共48页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工期延误下的工程索赔分析-建筑与土木工程专业论文

三 三 峡 大 学 全 日 制 专 业 学 位 硕 士 学 位 论 文 III III Abstract In the international engineering project, the claim has become a business strategy for many contactors. And it is an important means to protect contactors legitimate interests、 make up for the loss of engineering and improve the economic benefits. In recent years, with the rapid development of Chinas economy, more and more construction projects have appeared in the domestic, especially the large ones with the long construction cycle, the many construction units and a wide range of impact, which will cause many uncertain risks. Delay events occurred widely in practical projects, and they are unavoidable sometimes. If the project can not be completed on schedule, it will bring loss to the owner and the contractor. Both are reluctant to see the results. Study on the claims under construction delay has the vital significance to the contractor and the owner. It is an important link to ensure the propitious execution of the contract. Researching of engineering claims under the schedule delays has a great significance to control the engineering cost and to realize project expected benefits. This paper to the construction delay events mainly studies the following aspects: First, it explains the relevant provisions of FIDIC terms to duration claim and cost claim, which is the theoretical basis of claim events about engineering delay. Second, it analyzes the main causes of schedule delay. Through the analysis of the reasons, it can not only find out the factors about delay to nip the delay events in the bud, but also make the right judgments for the later analysis of delay events. Third, it classifies the construction delay events. According to the time when the delay events occur, it can divide to single delay and concurrent delay. This paper studied both delay events respectively. Fourth, it describes the basic problems of concurrent delay, such as characteristic, claim procedure and basic calculation method about the de

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档