网站大量收购闲置独家精品文档,联系QQ:2885784924

地铁隧道盾构法下穿施工对地表既有铁路的变形影响研究-结构工程专业论文.docx

地铁隧道盾构法下穿施工对地表既有铁路的变形影响研究-结构工程专业论文.docx

  1. 1、本文档共63页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地铁隧道盾构法下穿施工对地表既有铁路的变形影响研究-结构工程专业论文

ABSTRACT Along with the first phase of line 1 of Shijiazhuang Metro is about to enter a large-scale construction period, tunnel project in the construction process is restricted by varieties of complex planning lines surrounding environmental constraints, such as a variety of viaducts, existing buildings, structures, pipelines, and so on. Controllable range of construction disturbance various impacts on surface should be ensured under the normal construction of engineering. In the paper, the effect that metro shield tunneling have on the existing railway operators was assessed , analyzed and researched, with East Station-East Du Zhuang of the first phase of line 1 of Shijiazhuang Metro shield tunnel beneath the surface Shide railway as the background . The following contents are included: It is presented in the paper that mechanism of shield tunnel excavation construction disturbance on basement and the key features of stratum settlement. Taking the First phase of line 1 of Shijiazhuang Metro under the ShiDe railway as the background, a 3D finite element model was utilized by means of general finite element program ANSYS14.0. to Analyse and forecaste the resulting impact of the existing ShiDe railway on the settlement and level distortion. According to the construction conditions, finite element program Ansys is utilized to optimize double tunnel construction process. Compared with the settlement differences of railway when the two different tunnel excavation adopting various intervals between the excavation surface. The result is worked out that the subsidence influence close to the successively separate excavation and the excavating sequence will not impact additional settlement on the surface of earth, when the intervals between the both excavations surface larger than 24 meter. The result proves a reference data for the future similar projects and design. Shield tunneling was simulated with Elastic-plastic material constitutive and an elastic - plastic hybr

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档