网站大量收购独家精品文档,联系QQ:2885784924

工程建设项目风险管理分析和实例分析-工商管理专业论文.docx

工程建设项目风险管理分析和实例分析-工商管理专业论文.docx

  1. 1、本文档共74页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程建设项目风险管理分析和实例分析-工商管理专业论文

article carried on the discernment about the investment risk of construction project from two angles of investment risk type and phased risk. Chapter three, is analysis and assessment about the investment risk of construction project. The article has carried on analysis and assessment about the investment risk of construction project at first and then have explain the theoretical foundation of analysis and assessment about the investment risk and analyzed function of analysis and assessment about the investment risk explains its purpose and step. Continue article recommend the project investment risk analysis of the construction project and assess the method. On this basis, the article has intruded the method of analysis and assessment about the investment risk of construction project. Chapter four, is countermeasure analysis of the investment risk of the construction project. The article has expounded the concrete countermeasures of the investment risk of the construction project. These countermeasures include the risk lightening and risk shifting and the risk reserving and so on. Chapter five, is supervision and control of the investment risk of the construction project. The article has explained position and meaning of supervision and control of the investment risk of the construction project and probed into the method of supervision and control of the investment risk of the construction project. On this basis, the article and has further analyzed the implementation supervision and control of the investment risk of the construction project. Chapter six of the article is study for the case of management of investment risk of the construction project. Air liquide Zhejiang ASU project as an example, the article has carried on the positive research of the investment risk of construction project. KEY WORDS: risk management , engineering project , risk handle strategy 目录 前言… … ……… … ……… … ………… ………… ………… ………… ………… ……… 1 第 1 章 工程建设项目风险管理 ……………………………………………………………………2 1.1

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档