工程建设项目风险管理分析和实例分析-工商管理专业论文
article carried on the discernment about the investment risk of construction project from two angles of investment risk type and phased risk.
Chapter three, is analysis and assessment about the investment risk of construction project. The article has carried on analysis and assessment about
the investment risk of construction project at first and then have explain the theoretical foundation of analysis and assessment about the investment risk and analyzed function of analysis and assessment about the investment risk explains its purpose and step. Continue article recommend the project investment risk analysis of the construction project and assess the method. On this basis, the article has intruded the method of analysis and assessment about the investment risk of construction project.
Chapter four, is countermeasure analysis of the investment risk of the construction project. The article has expounded the concrete countermeasures of the investment risk of the construction project. These countermeasures
include the risk lightening and risk shifting and the risk reserving and so on.
Chapter five, is supervision and control of the investment risk of the construction project. The article has explained position and meaning of supervision and control of the investment risk of the construction project and probed into the method of supervision and control of the investment risk of the construction project. On this basis, the article and has further analyzed the implementation supervision and control of the investment risk of the construction project.
Chapter six of the article is study for the case of management of investment risk of the construction project. Air liquide Zhejiang ASU project
as an example, the article has carried on the positive research of the investment risk of construction project.
KEY WORDS: risk management , engineering project , risk handle strategy
目录
前言… … ……… … ……… … ………… ………… ………… ………… ………… ……… 1 第 1 章 工程建设项目风险管理 ……………………………………………………………………2 1.1
您可能关注的文档
- 工业厂房内具有强热源项热分层特性及通风系统优化研究-供热、供燃气、通风及空调工程专业论文.docx
- 工业厂房光伏屋面一体化设计及结构抗震性能研究-土木工程专业论文.docx
- 工业台秤称重管理系统设计及应用-控制科学与工程专业论文.docx
- 工业厂房通风系统优化设计与模拟-动力工程专业论文.docx
- 工业品企业品牌构建的特征研究——以上海鸿盛鸿机电科技有限公司为例工商管理专业论文.docx
- 工业厂房浮射流预测模型及通风系统的优化研究-供热、供燃气、通风及空调工程专业论文.docx
- 工业化进程中农民利益问题的研究-产业经济学专业论文.docx
- 工业品制造商SG公司定价与成本相互优化探索-会计专业论文.docx
- 工业厂房结构微振控制技术研究-结构工程专业论文.docx
- 工业品品牌形象的影响因素研究企业管理专业论文.docx
文档评论(0)