钢铁企业钢管合同组批问题的模型与算法研究-控制工程专业论文.docxVIP

钢铁企业钢管合同组批问题的模型与算法研究-控制工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢铁企业钢管合同组批问题的模型与算法研究-控制工程专业论文

上海交通大学硕士论文 万方数据 Study on Modeling and Optimization Algorithms for Steel Tube Order-grouping Problem in Iron and Steel Industry Abstract Steel tube order-grouping, which determines the corporate earnings and evaluates the competence of the company , is one of the most important problems in steel tube enterprise. The planner organizes multiple orders with the same specifications producing on one hot steel tube, of which the objective is minimizing surplus. With the sharp market competition, the production requirements are becoming small-volume and high-variety. Responding to the changing requirement and reducing the production cost have become the key issues to the development of steel tube enterprise. Therefore, studying steel tube order-grouping problem is of great realistic significance. According to the processing technic of steel tube, there are two types of steel tube order-grouping problem: First, enterprises buy steel tubes, of which the hot cutting is not exist; Second, steel tube enterprise use of steel tubes their own, of which the effect of hot cutting has to be concerned. The second type is investigated in this paper. It is a typical combinatorial optimization problem that widely spreads in the steel tube industry. This paper studies steel tube order-grouping problem aiming to meet the need on site. With the characters of steel tube order-grouping problem, a nonlinear mix-integer programming model is formulated. The object is minimizing surplus and the main constraints including equipment specification limits, the total order length and unit length are both interval values, hot cutting length requirements etc. are all taken into consideration in the model. For the sake of solving this problem, the programming model is transformed into a linear mix-integer programming one. Due to the large scale and real-time on site, a hybrid method combined with heuristic and MILP is proposed in this paper. There are two phases in this method: The one is dealing wit

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档