钢铁企业铁水运行优化与分析分析-交通运输规划与管理专业论文.docxVIP

钢铁企业铁水运行优化与分析分析-交通运输规划与管理专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢铁企业铁水运行优化与分析分析-交通运输规划与管理专业论文

西安建筑科技大学硕士学位论文 西安建筑科技大学硕士学位论文 Research and analysis of molten iron operation optimization of iron and steel enterprises Specialty:Transportation Planning Manegement Name:ZhengWenjun Instructor:Prof. Yang Qiuxia Abstract Molten iron transport in iron and steel enterprises plays an important role in the iron and steel production。The selection of molten iron tanker transport path between the blast furnace and converter, as well as the number of locomotives, have a major impact on the efficiency of steel production and transportation costs. Under the premise of the Blast Furnace with the construction of the railway line arrangement scheme designed already, this article described that making decision of the actual process of the locomotive on the railway line transporting molten iron tanker by simulating the process, make the molten iron transport organization plan by model-calculating,to optimize the the locomotive running path and determine the required number of locomotives in the way of blast furnace to the converter, and embodied in the form of a blast furnace molten iron working diagram transport operations. Using the combination of model and computer programming to achieve computer automatic drawing, can simplify the designers workto adjust the program, and avoid a lot of duplication of effort. In this paper, I do a research on the combination of model calculations and molten iron operation diagram analysis to study the following aspects: first, make a specific analysis of the actual operation process of molten iron running between blast furnace to the converter,to study the regularity and time requirements of the production and transport; secondly, considering the technological requirements of blast furnace production time, transport distance, insulation of molten iron, BOF production efficiency, to determine the type of molten iron locomotive running program; thirdly, by simulating the molten iron transportprocess, optimizethe path selection of locomotive railwa

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档