高密度电法对地下空洞的探测数值模拟研究-道路与铁道工程专业论文.docxVIP

高密度电法对地下空洞的探测数值模拟研究-道路与铁道工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高密度电法对地下空洞的探测数值模拟研究-道路与铁道工程专业论文

Abstract II 万方数据 THE NUMERICAL SIMULATION RESEARCH OF HIGH-DENSITY ELECTRICAL METHOD IN UNDERGROUND CAVITY DETECTION ABSTRACT With the rapid development of Chinas economy, large number of infrastructure projects are constructed rapidly, the construction site may cross the underground cavity, so the spatial location, size and the causes of different types of underground voids ascertained has very important significance to ensure the successful completion of project construction. Based on the numerical simulation methods, high-density electrical method in detecting underground voids researched. First, the forward theory of high-density electrical method is deduced and obtains the apparent resistivity formula of device. The introduction of robust inversion method and commonly used method of least squares inversion are compared, and the applicable conditions are obtained and verified. Secondly, through the ANSYS analysis module of the steady-state current conduction, the numerical simulation method is carried on the selection of different high-density electrical device parameters and the impact of different types of underground cavity on detection effect. Introduced the impact factor μ to evaluate the detection effects of different device types, and the influence of electrode spacing, the selection of the largest pole pitch, different underground voids depths, distribution patterns, resistance value, coverage layer thickness and the resolution is discussed to evaluate the impact of detection effect. Finally, combined the instances of mined-out areas exploration of Yangjia coal of Fuyang city and Chaoyang coal of Tonglu county, simulation analysis is conducted with the geoelectric conditions of 2 survey lines. The simulation results and field detection results are compared and analysised, and verified by the histogram of verify hole. Key Words: underground caves, high-density electrical method, device parameter, the conduction analysis of steady current wi

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档