- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
读万卷书 行万里路
For office use only Team Control Number For office use only
T1
60365
F1
T2
F2
T3
Problem Chosen
F3
T4
A
F4
2017
MCM/ICM
Summary Sheet
A Multiple Dam System for the Zambezi River
This paper aims to assess the cost and benefits of the three options interested by Zam-bezi River Authority (ZRA) in their efforts to ease the safety concern of the Kariba Dam, and to propose a feasible solution of Multiple Dam System (MDS) to water management problem on the Zambezi River.
In the first part, to assess the three given solutions, repairing, rebuilding and replac-ing the dam with ten to twenty smaller dams namely, the paper draws lessons from the history and takes the financial cost, safety, time, effects on ecosystem and impacts on life of the locals under scrutiny. We find out that repairing the dam costs the least and has little negative impact on either the ecosystem or the life of locals while the hazardous risk of crumbling still remains. Rebuilding may be a safer solution but at the expense of higher cost and huge damage to the environment. Replacing strategy costs a lot too but can eradicate the risk brought up by the Kariba Dam. With our assessment, the Zambezi River Authority (ZRA) now is able to take actions in terms of their needs.
Then, we successfully find a MDS, which is of better water management capability to replace the Kariba Dam. Important factors such as water flow, population density, fall and stratigraphy are carefully researched via existing literature and the Internet to deter-mine the location and number of the dams in the system. The preliminary screening of the locations is run by recognizing topography of sites that are suitable for dam-building in the contour plot we generate. Then, with the introduction of fuzzy comprehensive evaluation (FCE) method, the priority of potential sites is determined. Finally, we suc-cessfully figure out the location and number of the dams in our system with a careful look on the equilibrium between safety a