- 1、本文档共62页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公路海底隧道排水控制系统的设计控制工程专业论文
万方数据
万方数据
(f
ABSTRACTAB
ABSTRACT
AB STRACT
With the fast development of road construction in China,there are more and more road tunnels.A CROSS-harbour tunnel is located in the area which major weather disaster is storm.When it is raining or the waves across the island revetments,wastewater flows into the sump of pumping station through pipes.If wastewater exceeds the volume of sump,then wastewater will flow directly into the tunnel.It will cause traffic safety and affect the use of the equipment in the tunnel.So it is necessary to design cross-harbour tunnel drainage control system.It can effectively limit the amount of waste water within a reasonable range,
ensure safe opermion and improve management efficiency ofthe tunnel。
The paper describes the basic concepts of Distributed Control System,which includes basic structure,features,software,and network infrastructure.Based on Distributed ControI System architecture and the demand of efficient drainage and management,then the frame of Cross—Harbour Tunnel Drainage Control System is introduced.The system is divided into three parts:pumping station drainage control system,computer monitoring system and data
communications network,and their composition,features and functions are described. Follow PLC control system design process and after comprehensive consideration,PLC
is used as controller for pumping station drainage control system.The PLC using in this system is Siemens S7·1 500.Then the hardware design of the system is introduced. According to the Ladder language programming rules,PLC program of the system is designed by step7 professional V 1 3.Upper computer software,which the design of UI and functions is completed,is developed by ForceControl configuration software v7.0.
The experiment platform of the system is set up in laboratory,and the hardware and software of Cross-Harbour Tunnel Drainage Control System is debugged.The result of the test is shown that the system is stable and reliable.The quantities of
您可能关注的文档
- 基于图像处理技术的绝缘子裂纹识别研究农业电气化与自动化专业论文.docx
- 高校家庭经济困难学生资助体系研究思想政治教育专业论文.docx
- 纳秒脉冲驱动准分子光源的实验及模型研究物理电子学专业论文.docx
- 电液颤振参数对金属冷挤压振动加工的影响分析和实验研究机械工程专业论文.docx
- 磁控形状记忆合金微位移执行器模型的研究模式识别与智能系统专业论文.docx
- 光伏发电系统建模及其并网容量研究农业电气化与自动化专业论文.docx
- 鞍山市政府集中采购管理系统设计与实现软件工程专业论文.docx
- β拉帕醌通过emt抑制乳腺癌侵袭转移的机制研究病理学与病理生理学专业论文.docx
- 高温燃机叶片用氧化铝基陶瓷型芯的研究材料学专业论文.docx
- 单芯片网络交换机的qos设计与实现电子与通信工程专业论文.docx
文档评论(0)