- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
半拉山堤防工程项目管理探索和研究水利工程专业论文
半拉山堤防工程项目管理探索和研究The
半拉山堤防工程项目管理探索和研究
The exploration and research on The ban—la-shan mountain dike project management
Abstract
The ban—la-shan mountain dike project is located at the convergence of Nenjiang River right bank branch named Zhuo’er River and the Nenjiang River,which is the return bank ofthe Nenjiang River main current;It’S totally 16.3km long and it’S flood prevention standard is 20 years.Once the wen-de·gen reservoir is completed,the combination of也e dike and the reservoir will improve its flood prevention standard to 50 years,which belongs second—class dike.nle main duty of this project is to heighten and widen the e)【isting embankment according to the design standard,and to build 4 new constructions and to service l constructions.
This project belongs to the infrastructure construction totally invested by the nation,the engineering project legal person is constituted by Song-Liao Hydro-conservancy Comittce,and which is responsible for the entire process of the engineering construction.According to ban-la-shan mountain dike project design proposal which the country has given a reply,using the project management method,
Owner has formulated ban-la-shan mountain dike engineering project management plan
and pmposed the explicit goal of the engineering construction manages;detailedly
worked out the implementation and management plan of the project progress,the project quality and the project investment;worked out various regulatory regime,measure and methods according to the plato forecasted the possible risk of也e project and formulated the
predetermined plan of the risk management.Through the formulation of the perfect
management plan,the project implementation process iS a11 the time under the contr01 ofowners total goal,which has laid the good foundation for the project Success.
In the project imptementatinn process,it is requested that participators stdctty
execute project management p18n and feed back the information in time;At也e same
time the owner
您可能关注的文档
- 分片式处理器上指令调度器的设计与优化计算机系统结构专业论文.docx
- 博客价值开发应用分析计算机应用技术专业论文.docx
- 超高压输电线路单端暂态电流保护算法的研究-电力系统及其自动化专业论文.docx
- 公共项目管理成熟度研究项目管理专业论文.docx
- 供应链环境下供应商选择之研究——基于主成分分析与神经网络的供应商选择问题之研究计算机应用技术专业论文.docx
- 磁光晶体纳米单元阵列材料的物性研究电子与通信工程专业论文.docx
- 多哈回合中的多重博弈及可能出现的结果国际贸易学专业论文.docx
- 低维纳米结构材料的可控制备与性能研究无机化学专业论文.docx
- 风力发电机组控制系统关键技术研究机械工程专业论文.docx
- 北京石油化工和新材料产业基地评价指标体系研究技术经济及管理专业论文.docx
- 高校学生干部群体现状和选拔研究思想政治教育专业论文.docx
- 城市里中小型无污染新型专用工业建筑若干设计问题研究建筑设计及其理论专业论文.docx
- 城市型旅游产业集群影响因素研究旅游管理专业论文.docx
- 敦煌石窟唐五代官员画像之服饰研究历史学历史文献学专业论文.docx
- 成功智力理论及其在教学中的应用教育学课程与教学论专业论文.docx
- 生物活性炭降解养殖场臭气中氨气和硫化氢的研究环境科学与工程专业论文.docx
- 插入件积分场测量装置研制及相关技术研究核技术及应用专业论文.docx
- 地方政府融资平台的信用风险分析金融学专业论文.docx
- 短蛸体表及粘液性免疫机制的研究动物学专业论文.docx
- 二元股权结构与上市公司控制权配置效率研究政治经济学专业论文.docx
原创力文档


文档评论(0)