- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
多泥沙河流泵站前池防淤积措施研究水利水电工程专业论文
II
II 扬州大学硕士学位论文
Abstract
The forebay of a pumping station is a segment that connects intake channel and intake sump,and it Can make the flow in the intake channel spread smoothly into the intake sump,SO that each pump unit has a more smooth flow pattern.If a pumping station is built on the sediment-laden fiver,because hydraulic conditions of the forebay
are changed due to sediment deposition,the flow pattern of the forebay and flow conditions of the pump deteriorate which Can decrease the efficiency of pump system and bring great difficulties in operation and management of the pumping station.
Dregding in the forebay is usually not very effective,because a new deposition forms soon after dredging.Therefore,using project measures to solve the sediment deposition of forebay is important to save water and energy,improve economic benefit of the
pumping station.
This paper takes an example of number six Guhaikuoguan pumping stations in Ningxia whose water resources is the Yellow River.The numerical simulation and model experiment are combined to do research.Based on these,preventing the
sediment deposition of forebay is researched.
In aspect of model experiment,the similarity criterion of water movement and suspended sediment movement is used,the model scale is determined.According to the model scale and the features of model sediment,electric sawdust is selected as model sediment.Based on the experiment of clear water,the flow pattern of the original design and the design after the flow pattern modifying technology is observed.
The area of sediment deposition is analyzed,and preliminary schemes of modifying
the flow pattern is put forward.Furthemore,the experiment of muddy water is done in the condition of the original design and the design after the flow pattern modifying technology,and the sediment distribution of every section is measured.Then, preventing the sed
您可能关注的文档
- 壁上有孔的二氧化硅空心球的制备高分子化学与物理专业论文.docx
- 对外汉语远程教学的调查和分析汉语国际教育专业论文.docx
- 低强度脉冲超声治疗卵巢切除大鼠骨折的研究外科学骨科学专业论文.docx
- 多模医学图像处理平台及基于隐含形状表示和边缘信息融合的图像配准算法研究信息与通信工程专业论文.docx
- 杜香化学成分及抗炎止痛作用研究植物学专业论文.docx
- 党政女性领导培养选拔对策研究行政管理专业论文.docx
- 复星医药并购战略和绩效分析工商管理专业论文.docx
- 从现场总线到工业以太网的实时性问题研究控制科学与工程专业论文.docx
- 电子商务在p公司超高性能灯业务部门中应用模式分析与策略研究企业管理专业论文.docx
- 船舶配套贸易商行的竞争战略研究工商管理专业论文.docx
最近下载
- 部编版六年级语文上册一二单元测试卷.doc VIP
- 2024年9月江苏省税务系统遴选面试真题带详解.docx VIP
- 20192020学年人教部编版六年级语文上册第一二单元测试卷.doc VIP
- 【人教部编版】小学语文六年级上册单元测试卷汇编一.pdf VIP
- 部编版六年级上册第一单元测试卷 人教(部编版).doc VIP
- 湖南省衡阳市名校联考联合体2024届高三高考考前仿真联考一数学试题含答案.docx VIP
- 年产6万吨合成蜡深加工项目(红石化工公司)环境影响报告.docx
- 2025年护理人员N1进阶N2考试试题及答案 .pdf VIP
- DB21T1342-2021 建筑工程文件编制归档规程.pdf
- Unit-1-Discovering-Useful-Structures-超好用的公开课获奖课件-(.pptx VIP
文档评论(0)