冷却塔辅助冷却地源热泵系统的研究土木工程专业论文.docxVIP

冷却塔辅助冷却地源热泵系统的研究土木工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
冷却塔辅助冷却地源热泵系统的研究土木工程专业论文

AbstractSoil Abstract Soil source heat pump system has been widely applied due to its advantages of high efficiency and energy saving.But it still exists problems such as geographic limitations and economy during the use of this system.There is a summer heat than winter heat problem in ground source heat pump system in predominantly summer air conditioning area.There exists a problem that the heat taken from the soil in winter is greater than the heat in summer in cold region.The soil to exothermic imbalance will lead the soil temperature of this system significantly to deviate from the initial temperature after long—term running.And the efficiency of the system will drop after long—term running.The underground thermal balance problem is an urgent problem for the soil source heat pump system.It is good to keep the heat balance to use cooling tower auxiliary ground source heat pump system.It has a important significance to research the operation strategy of the cooling tower to improve the system efficiency and keep thermal balance adjustment. Based on the cylindrical source model of underground soil,the heat transfer between buried pipe and soil was simulated in this paper.And the results were verified according to the experimental platform of simulation.Then a long-term operation could be simulated in this system.And we can study the operation of the ground source heat pump to the influence of the underground thermal balance and the thermal recovery ability of the soil. According to the simulation results,it can lead to the phenomenon of underground heat accumulation for long—term running soil source heat pump system.The temperature of the soil has a recovery trend in the transition period.In order to adjust the underground thermal balance,we can only run the cooling tower in the eraly and late of the cooling season.On the other hand,we can cascade the cooling tower and the buried tube heat exchanger directly in the transition season. Four kinds of operation strate

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档