基于NET的高速公路机电设备维护费用预算系统的设计与实现-交通信息工程及控制专业论文.docxVIP

基于NET的高速公路机电设备维护费用预算系统的设计与实现-交通信息工程及控制专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Design Design and Realization of Expressway Electro--Mechanical Equipment Maintenance Cost Budget System Based on.NET A Dissertation Submitted for the Degree of Master Candidate:Kuang Fan Supervisor:Prof.Xu Hongke Chang’an University,Xi’an,China 独立进行研究 独立进行研究 文的研究做出 文中不包含任 本声明的法律责任由本人承担。 本人 校。学校 利。本人 果时,署 (保密的 以及使用年限的不断增 以及使用年限的不断增 费用预算作为其中一个 实际消耗费用或设备的 题。后来提出基于国家 公路工程概预算体系的Excel套表进行预算,该方法准确合理,但灵活性差、效率低下。 针对这一现状,本文采用计算机网络搭建一套基于国家公路工程概预算体系的维护费用 预算系统,既解决了传统方法缺乏合理性的缺点,又将繁琐预算的编制工作交给计算机, 使得费用预算工作变得简单、迅速、方便,大大减轻预算人员的工作量。 本文介绍了高速公路机电设备维护费用的组成和计算方法,分析了设备故障分类及 分布曲线描述,引入一种基于役龄递减因子和故障率递增因子的混合式故障演化规则, 建立 度、 得到 果比 的维 求分 2005 该预 能特 了Ab 了 Ab stract With the extension of expressway mileage,the expansion of expressway network scale and the increase of expressway service life,operation and maintenance of expressway are becoming important day by day,electro·mechanical equipment maintenance cost budget has arosen increasing attention.At present,the method based on historical and actual consumption or equipment’S value and its service life is adopted in company.Those two methods are simple and operational,but neither of them is reasonable.Later,a set of excel based on national road project budget system is established.The method is accurate and reasonable,however,it is inefficient and inflexibility.Under this circumstance,a maintenance cost budget system is build up witll computer network.The system overcome the shortcoming of traditional method,in addition,it turn over complicated budget preparation to computer,SO that it is simple,convenient,and accurate to deal谢m cost budget, simultaneously,the work load of budget staff is greatly reduced. In this paper,above all,composition and calculation of expressway electro—mechanical equipment maintenance cost are described;then,failure classification and distribution curve is analyzed.A failure dynamic evolution rule based on age reduction factor and failure rate increase factor is proposed.Under this rule,three dynamic maintenance period

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档