基于粗糙集理论和支持向量机的短期负荷预测研究-电力系统及其自动化专业论文.docxVIP

基于粗糙集理论和支持向量机的短期负荷预测研究-电力系统及其自动化专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
II II Abstract Economic and reliable operation of power systems depends significantly on the accuracy of the short-term load forecasting .The short-term load forecasting is very important for the unit optimal combination、economic dispatch and optimal power flow in the dispatching department, and it is especially significant to the power market. The more accurate the load forecasting is, the more efficient the usage of the units and the economic dispatch will be. With the development of the modern power system, the load forecasting need to be more accurate and rapid, and these requires make the load forecasting methods become more intelligentized and combination. This paper will research on one of the intelligentized methods—Support Vector Machine (SVM), find out its weakness and improve it, then built the combination model based on the SVM and rough set theory. The paper first researches the basis theory of SVM. The SVM model can more accurately forecast the future data by the structural risk minimization property. The sequential minimal optimization method can solve the quadratic programming problem of SVM. In order to analyse the inherent character of the load, the paper chooses the history load data of close time, and finds out the key attributes by the effective algorithm of attribute reduction in the rough set theory. On the other hand, the paper uses the load clustering analysis to improve the computing speed. We will choose the appropriate samples to make several SVM models, and the method can shorten the computing time. The combination model can exactly forecast the smooth load, then the paper continue to solve the load fast tracking problem after the mutable load and propose the similar day forecasting method. The method chooses the similar samples by the date type, weather type and the evening load level, then uses the combination model to forecast the load. At last the computation example shows that the method can solve the load fast tracking p

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档