基于资源的汽车白车身装配CAPP及仿真系统的研究与实现-机械制造及其自动化专业论文.docxVIP

基于资源的汽车白车身装配CAPP及仿真系统的研究与实现-机械制造及其自动化专业论文.docx

  1. 1、本文档共92页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
AbstractTo Abstract To improve the quality and efficiency of automotive body assembly and manage the manufacturing resource,researches on computer aid process planning are conducted in the paper.The paper is divided into three parts according to the actual manufacturing sequence,the assembly sequences planning,the assembly process pl锄ing and the production simulation.Sub research topics include the genetic algorithm for assembly sequences planning based on assembly constraint,modeling of the manufacturing resource,graphical and interactive process planning,the data.shating between process planning and system simulation,material flow simulation in workshop,assembly line balancing and the production simulation· A integrated system for process planning,production simulation and data managemerit is developed by Obj ect.oriented programming method with the support of VC++6.0 and SQL Sever.The conception of“Assembly Cell’’which can make the process planning graphical,modular and intelligent is put forward in the paper·The inquiry and edit of the technical data and the automatically creation of production guide book is realized.In addition,user management based on the authority assignment is provided by the system. The work has been done are as follow: (1)The process planning and production simulmion were connected smoothly· The Droduction simulation was drived by the result of process planning and the process planning was redeployed according to the result of production simulation· (2)Defined the types of assembly constraint and characteristic dimension.The genetic al gorithm aimed to find the most reasonable assembly sequence under assemblV constrains was carried out based On the“feature mark’’and assemblability function. (3)Process planning was done directly using the assembly cells which were based on the manufacturing resource.This design WaS much easier to modify and save than before. (4)Process planning was designed with a graphical user interface in a creative III

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档