环锚无粘结预应力混凝土衬砌隧洞在线监测及安全评价研究-结构工程专业论文.docxVIP

环锚无粘结预应力混凝土衬砌隧洞在线监测及安全评价研究-结构工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ABSTRACTHydraulic tunnel is the most common type of diversion structures in hydraulic and hydroelectric engineering, mainly used for flood discharge, diversion and power, conveyance of water irrigation, excretion reserrvoir sediment, diversion etc. The tunnel liner pre-stressed with circumferential un-bonded tendons as a new structure was gradually applied to hydraulic tunnels recently. It is a new type of structure which can full play to the characteristics of prestressed. Which is suitable for the hydraulic tunnel engineering with high water head, thin surrounding rock, and poor geological conditions. If the leakage took place, it may cause fatal accidents such as the damage of adjacent buildings or the failure of side slope. Up to now, prestressed concrete liner has been used in a number of large hydraulic engineering in China, for instance, the hydropower tunnel of Ge Heyan hydroelectric power plant, Tian Shengqiao hydropower tunnel, Yellow River crossing tunnel of south-to-north water transfer project, as well as Xiao Langdi sediment tunnels and Liaoning Da Huofang reservoir water conveyance tunnels. Compared with other structures, the tunnel liner pre-stressed with circumferential un-bonded tendons has many outstanding advantages, but as a new structure the security and reliability restrict its general application.Based on the first hydraulic tunnel of the liner pre-stressed with circumferentialun-bonded tendons Xiao Langdi sediment tunnels, analysis a lot monitoring data since June 1999 in operation. Obtained the layout of monitoring sections, the analysis method of monitoring data and the influencing factors of monitoring instruments according to this kind of structure. Also determined the running state, the structure safety evaluation and the safety warning value of the tunnel liner pre-stressed with circumferential un-bonded tendons during operation period. By the above analysis also showed that: after operation more than ten years, on various environment,

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档