上海交通大学机械与动力工程学院工业工程与管理系生产计划与控制Chapter7lecture4 MRP- Alternative Lot-sizing Schemes.pdfVIP

上海交通大学机械与动力工程学院工业工程与管理系生产计划与控制Chapter7lecture4 MRP- Alternative Lot-sizing Schemes.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Production Planning and Control Chapter 7 Production Planning Professor JIANG Zhibin Dr GENG Na Department of Industrial Engineering Management Shanghai Jiao Tong University Chapter 7 Production Planning Contents • Introduction • Master Production Scheduling (MPS) • Material Requirement Planning (MRP) • Capacity Planning • Improvement in MRP MRP- Alternative Lot-sizing Schemes •Lot for lot (LFL): the number of units scheduled for production each period is the same as the net requirement. •LFL is only for convenience and ease of use, rather than optimal; •The problem of finding the best or near optimal production plan is described as Having known the time-varying demand and costs of setup and holding, what production quantities will minimize the total holding and setup cost over planning horizon? •Neither the methods of Chapter 4 nor those of Chapter 5 may be appropriate. MRP- Alternative Lot-sizing Schemes •EOQ Lot Sizing Three parameters are required: the average demand , the holding cost h, and setup cost K ; Consider the valve casting assembly: K=$132; the holding cost is $0.6 per unit per week; The planned order release resulting from a LFL policies requires production in each week; If the holding cost is charged against the inventory each week, the total holding cost incurred from week 6 through 15 is 0; Since there is one setup each week, the total setup cost incurred over 10 weeks planning horizon is 10132=$1,320. MRP- Alternative Lot-sizing Schemes •EOQ Lot Sizing (Cont.) The cost can be reduced largely by producing larger amounts less often; As the “first cut”, EOQ formula is used to determine an alternative production pol

您可能关注的文档

文档评论(0)

ormition + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档