煤矿矿井嵌入式数据采集分站的研究与实现-通信与信息系统专业毕业论文.docxVIP

煤矿矿井嵌入式数据采集分站的研究与实现-通信与信息系统专业毕业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
武汉理工大学硕士学位论文Abstract 武汉理工大学硕士学位论文 Abstract Coal mine data collection substation iS the hinge between the safety.monitoring module under the mine and the safety-monitoring center above the mine.it takes charge of data collection and communication between the safety-monitoring module and the safety.monitoring.It is determined by data collection substation that wether the coal mine safetY.monitoring can W0rk e衔ciently,and the data collection plays important part in the coal mine safety-monitoring. Aiming at the requests.high performance删7 chip LPC2292 is adopted器 main processor by t11is PapeL ThrougIl the SPI,the Ethemet controller chip iS driven and the TCP/IP communication is realized.Throu吐the inner CAN controller of ARM.the CAN communication is realized fits well.Embedded real-time operation system ItC/OS.11 which iS transplanted to the project.the whole system has the features ofhigh reliability and strong expand ability. nle main topic of this paper is the design of TCP/IP communication module which is being introduced detailedly around each independent module of COal mine data collection substation.nle power and reset module.CAN communication module。 LCD display module.rework and storage for parameter module are introduced as well. On the foundation of the hardware design,the softavare design based on oporation system rtC/OS.II iS processed.The software design contains two parts.One is hardware driver program,another is system task.Driver program contains the realization process of each module.and the realization process of TCP/IP communication is mainly introduced.According to the practical function of each module of the substation,the PRI of tasks is assigned and the design flows of COal mine data collection substation’s tasks are introduced in the system task part.. In the whole system design,each software design and hardware design adOpt the anti-jamming method in order to enhance EMC ability.The whole system is nmning well in practice.and the effectively da

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档