天津大学硕士毕业论文
英文摘要
ABSTRACT
In recent years, with the rapid increase of the foundation pit depth to 20-30 meters, a lot of deep and asymmetric foundation pit exists in our city. In soft soil area which is full of water, the project of excavation of foundation pit will face the problem of under-ground water inevitably. If we use the water stop curtain or underground continuous wall on the confined aquifer under the bottom of the foundation pit truncation, we may find that the underground continuous wall is a highly cost and difficult construction, and its reliable quality can not be guaranteed. Considering the above difficulties, the paper makes some points on following aspects.
In the view of the asymmetric excavation, through the analysis of the whole construction process of the measured data, the paper make the study of process law of horizontal displacement of the retaining structure of foundation and deformation of the wall. At the same time, in the view of the symmetric and asymmetric of foundation pit, carrying on the numerical simulation of the step-by-step excavation of the precipitation through the finite element method. Through the comparative analysis of deep foundation pit deformation and stress distribution caused by asymmetric negative rule, and compared with the measured data of the construction process analysis, summarizing the rules of structure deformation behavior which is caused in the process of precipitation step-by-step excavation of foundation pit. Finally, making some reasonable suggestions for the asymmetry foundation pit design and construction.
Finite element numerical model is set up for decompression process influence on pile foundation. The numerical simulation result shows that as the decompression going, the pile friction resistance is significantly decreased and even negative friction resistance exists. However the target aquifer and its adjacent to the upper part of the water-resisting layer appeared inflection point S type, maki
您可能关注的文档
- 枯草芽孢杆菌基因组最小化代谢网络模型的构建-制药工程专业毕业论文.docx
- 民国时期安徽茶业分析-茶学专业毕业论文.docx
- 抗热应激中草药饲料添加剂的作用机理研究-动物营养与饲料科学专业毕业论文.docx
- 煤矿井下电力电子设备电磁干扰的研究-电力电子与电力传动专业毕业论文.docx
- 空钩人物称能事前有龙眠今有济-国画专业毕业论文.docx
- 空芯光纤气体填充特性研究-物理电子学专业毕业论文.docx
- 黄海灵山湾和海州湾海域腹泻性贝毒季节变化规律研究-食品工程专业毕业论文.docx
- 黄河班多水电站工程布置与安全监测评价分析-水利工程专业毕业论文.docx
- 抗盐聚合物含油污水沉降特性及工艺适应性研究-环境工程专业毕业论文.docx
- 面向单幅图像的超分辨率的方法-计算机技术专业毕业论文.docx
- 惠州市鹏诚光电科技有限公司手机钢化膜的生产建设项目环评报告表.docx
- 南通海江铝业有限公司年产5万吨再生铝合金锭液项目环境影响评价公众参与说明.docx
- 年产2万吨肥料项目环评报告表.pdf
- 年产12万吨水溶肥、1万吨复混肥、1万吨掺混肥、1万吨有机无机复混肥、1万吨鱼蛋白甲壳素海藻肥、1万吨土壤调理剂、1万吨农林保水剂、1万吨微生物肥及微生物菌剂项目环评报告表.docx
- 连云港翰鑫再生资源科技有限公司年产500万件铝镁合金汽车配件项目环评报告表.docx
- 江苏诺恩作物科学股份有限公司敌草快灌装线建设项目环评报告表.docx
- 年产5万吨特种干粉砂浆生产线项目环评报告表.docx
- 年产150万米新型绿色低碳装配式建筑材料、40万立方米新型建筑用混凝土实心砖项目环评报告表.pdf
- 华阳精机汽车轻量化零部件产品产能扩建项目(三期)环评报告表.docx
- 江苏沿海输气管道海安-泰州-扬州段(A段)工程公参说明.docx
原创力文档

文档评论(0)