网站大量收购独家精品文档,联系QQ:2885784924

兰州连城铝业净水厂高浊度水处理系统优化-材料科学与工程专业论文.docx

兰州连城铝业净水厂高浊度水处理系统优化-材料科学与工程专业论文.docx

  1. 1、本文档共89页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程硕士学位论文Abstract 工程硕士学位论文 Abstract China is one of the countries whjch are疳uit wlm a lot ot sand nVers.1 here are 42 rivers of which the锄ual average v01ume of salld conveying amounts to morc than l million tons,and 60 rivers’annual maxim啪s aIld conVeying v01ume rise above 1 miUion tons.The direct annual volume of earth and sands enteriIlg me sea is 1.94 billion tons,of which,me YelIow Rjver shares 59%,the ChaIlging RjVer enjoys 25%,Haihe mver a11d otherrivers occupies 16%.The Yellow RiVer is the riVer with plenty of sands in the world. At present,traditional process is mainly adopted to treat hi曲turbid and slight polluted water in domes“c.That is saying,nle process of condensation—÷sedimem_ filtration—}disillfection is used.This process possesses a lot of meTits such as low investment,steady operation aIld simple maintenance and mamgement,etc.HoweVer, being restrained by its disinfection function,me process’s ability to delete o曜anic mattcr inside the water is poor,especially its e丘’ectiveness are worse for eliminating orgaJlic matter of s01uble low moleculaL’rherefore,it has become an imponant problem for the waterⅡeafmem gmup on how to impmVe the pmduction c叩acity of traditional watertreatment process aIld ensure safer water supplying by optimizing the high turbid water treatment process and its operation way. The optimization of high turbid water treatment system mainly starts from me optimization ofthe process and the operation ofwater treatnlent system,proVe the feasibility of the optimized process by model test and productive trial,find out the existed problem and improVe them,and make out the releVant ways of process operation a11d fIlnction parameters. The thesis takes the production practice of the Disinfecting Plant of Liancheng AluITlinum InduStry as the basis of the research,dirccts to the actual situation of worsen water quality at discha唱e when lligh muddy water enters the Disinfecting P1ant during nood season in summer,on me fundament of wjdely stIldy

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档