三峡大坝混凝土快速施工方案及工艺.docxVIP

三峡大坝混凝土快速施工方案及工艺.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
三峡大坝混凝土快速施工方案及工艺 The Three Gorges dam concrete rapid construetion scheme and process of.Txt without a line you see me online, hurry to stealth, rest assured? Im not going to mess with you. Good now but never abandon they do fast construction scheme of Three Gorges dam concrete and process. overview The dam of the Three Gorges project is a concrete gravity dam with a maximum dam height of 181m. The total amount of concrete pour ing in the key project is 28 mill ion m3. The total amount of construction of such a huge concrete project has led to the high strength construction of concrete construction in the Three Gorges project? concrete construction strength The peak of concrete pouring in the Three Gorges project is concentrated in the second stage project, with the total concrete pouring up to 18 million 600 thousand m3. According to the progress of construction and the overall schedule, 1998 was 1 million 180 thousa nd, m31999 was 4 mill ion 580 thousand, iti32000 was 5 million 480 thousand, m32001 was 4 million 30 thousand, and m32002 was 1 million 420 thousand m3. The peak construction period is from 1999 to three years in 2001, which in 2000 was the highest strength of concrete pouring, require the highest placement rate reached 5 million m3, the highest reached 400 thousand M3, up to date more than 20 thousand m3. concrete construction methods According to the analysis of the concrete strength and the construction site, the traditional gate tower placement and construction methods can not meet the strength requirements of the pouring, pouring must find new means of high strength. In addition, the large gate tower placement scheme from the mixer outlet to pouring concrete, adopt intermittent feeding mode, transit link feeding, the feed efficiency is 1 ow, a mixer and multi gate tower machine with multiple placement production combination perplexing, easy wrong material, more construction management the difficulty? concrete construction process The Three Gorges

文档评论(0)

ggkkppp + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档