改铸件及机加量产工艺包含模拟幻灯片.pptx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Wescast Industries (China) Co., Ltd Wuhan / Hubei ;BOSCH MAHLE TH GM1.5L ? 2040-065-0322 machining/3040-070-0109_00_FS Casting 1040-065-0202 Assembly Material: 1.4837 ? ;Wescast Industries (China) Co., Ltd - Expertise;;1;1套热芯盒(1模3腔) 1 sets hot core box, 3 cavities/ box ;BMTS GM1.5L Z955 hot cores;10 cavities per mold;GM1.5L_Simulation_report;Simulation data Set up;Casting 3D;Hot Spot;Hot Spot Other direction Z and X ;Feedmod and Riser;Porosity by X-ray;Porosity by Cut;Summary;Simulation data Set up;Gating system;Porosity by X-ray;Porosity 12 by Cut;Porosity 3 by Cut;Summary;Simulation data Set up;Gating system;Hot Spot;Porosity by X-ray;Check Casting by Cut;End Thanks;Wescast Industries (China) Co., Ltd Wuhan / Hubei ;;Capacity Analysis – Machining--Local;BOSCH MAHLE TH GM1.35L Manufacturing Process ;BOSCH MAHLE TH GM1.35L Manufacturing Process ;OP10 to OP 40;Bosch Mahle TH GM1.5L Machining Process -steps to be done in between machining operations-; Machining Process OP 10/OP15;Machining Process OP 10;Machining Process OP 10 – Locator Points;Process: 3 steps/2 fixtures Locating datum: X, Y, Z;;Machining Process OP 20;Machining Process OP 20;Machining Process OP 20 – Locator Points;Process: 1 steps/1 fixture Locating datum: C, H;Machining Process OP 20 – Error proofing; Machining Process OP 30;Machining Process OP 30;Machining Process OP 30 – Locator Points;Process: 1 steps/1 fixture Locating datum: C, H;Machining Process OP 30 – Error proofing;Machining Process OP 40/45;Machining Process OP 40+45;Machining Process OP 40+45 – Locator Points;Process: 3 steps/2 fixtures Locating datum: A, B,C;Machining Process OP 40 +45– Error proofing;Manufacturing Process OP 50;Equipment: ATEQ F520 Parameter Pressure: 150kpa Fill Time: 10.0s Stab Time: 12.0s Test Time: 10.0s Measure Rang: 1-5000Pa/s BMTS Require: 100Pa/s;Manufacturing Process OP 60;Equipment: Dedicated Assembly Machine;Manufacturing Process OP 70;;Manufacturing Process OP 80;Equipment: Shanghai Chuanyixinnong

文档评论(0)

a13355589 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档