福特公司-APQP教程.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
* APQP for Emerging Market Re-sourcing vs. Ford APQP v3.2 Sheet of “Action Plan” has been added. * APQP for Emerging Market Re-sourcing vs. Ford APQP v3.2 APQP for EM Re-sourcing uses 7 EMLP milestones (for re-sourcing programs); APQP v3.2 uses 12 FPDS milestones (for new programs). APQP for EM eliminates New Program specific requirements, which are not required for Re-sourcing Programs, from APQP v3.2. Maintains original APQP requirements as guideline. Checklist includes additional EMLP unique Supplier responsible requirements for the 23 elements. (At bottom of the checklist for each element.) Worksheet of “Action Plan” has been added to APQP for EM, to reduce “copies and pastes” of action plans from 23 elements to the summary sheet. For forward model (new) programs, Ford APQP v3.2 should be used. * Complete APQP Status Report – For EM Re-sourcing programs Complete Information Sheet Input milestone dates. Should be same as timing plan. Input Part Number and PPAP information. Input team information, for both supplier and Ford. Input program change history, if any. * Complete APQP Status Report – For EM Re-sourcing programs -- continue Complete Program Information on sheet of “APQP Status Report (linked)”. * Complete APQP Status Report – For EM Re-sourcing programs -- continue Review status of 23 elements. Next slide uses status review of element 11, drawing and specs, at PR as an example. * Sample Check sheet at PR Light Gray shaded cells: Review expectation at these milestones. If R or Y, this issue requires corrective action If R or Y, review at next milestone (until it’s G), even if “Finish Target” date is passed. Overall status is worst rating of all expectations. Manual input is NOT required. Record identified issue and corrective action here. Status Can be updated continuously until Milestone Date is met Prior Milestone Status is Frozen Input actual start and finish dates for each expectation. * Rating and Assessment – G/Y/R Status Risk Color Definition

文档评论(0)

ddwg + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档