哈萨克斯坦某公路工程施工组织方案(英文稿).doc

哈萨克斯坦某公路工程施工组织方案(英文稿).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PAGE 4- 4- PAGE 17 CONSTRUCTION ORGANIZATION PLAN Section 1. General Description of Construction Scheme I. Division of Road Sections and Tasks 1.Road Sections Division To achieve economy and efficiency, the road is to be divided into two sections to obtain optimum construction related activities within a stipulated time frame for completing the project. The division of road section is as follows: No. Section Description Type of Related Works 1 Km0+000~Km 60+000 Roadbed, pavement, bridge, culverts and auxiliary works in the section 2 Km60+000~Km 122+200 Roadbed, pavement, bridge, culverts and auxiliary works in the section 2. Labor Force Assignment No. Section Construction team Remark 1 Section 1 Roadbed Team I, BridgeCulvert Team I Pavement Team for all road surface construction of the project. Precasting Plant placed in Pavement team site. 2 Section 2 Roadbed Team Ⅱ, BridgeCulvert Team Ⅱ Notes: the project department may adjust internal labor force at any time according to the schedule of roadbed team and Bridgeculvert team. Ⅱ. Working Procedure Please refer to working procedure chart Ⅲ. General Introduction of Scheme Organize professional team to construct according to principle of parallel flow operation. In the construction, key point will be put on peeling off existed road, earthworks of roadbed and paving works of road surface. At the same time of ensuring the construction of key works, bridge culvert works will be immediately conducted after preparation to provide conditions for the construction of roadbed. Roadbed works is conducted with sectorization in compliance with allotment of earthworks. At the part of roadbed earthwork centralized, mechnical operation is applied. Manpower and mini-type machinery operation is utilized for scattered works. After the roadbed has been formed for a certain length, duly organize the road surface construction to meet the requirement of construction duration and fulfill the requirement of continuous construction of

您可能关注的文档

文档评论(0)

zzqky + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档