- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Comparative analysis of the Public works construction management
Abstraction:There are some advantages and disadvantages during the traditional mode of public works construction management, building center and construction agent in public works
Key word:public work,management.
Traditional construction management mode can make a solid foundation for the carrying out of the projects, and that is because the government plays an important role in public works and they have a good cooperation. In the other hand, the owner status is unclarity under this mode, moreover, it also brings out trouble waters in management and will have bad influence in supervision mechanism. In the background of the mode, the project management is backward and the risk aversion mechanism is not perfect, the investment benefit and social benefit for the government is not perfect.
First, building center mode is realizing the centralized management, making the main responsibility clear, and resolving the problems in the phenomenon of the absence of specific oversight of the government investment projects, it can help preventing corruption, which brings out a certain degree of centralized management. There are a number of professional and professionals and technical will be trained well. Compared with traditional construction management, achievement projects undertake a government investment projects, and carry out by the planning department, the formulation of the base bid and the contracts must be reviewed by the audit department. The project bidding including the bidding units prequalification must accept the supervision of the City Construction Bureau. And the project funds are paid directly by the Bureau of Finance, and accept the supervision of it. It can be said that, the construction center is to be responsible for the quality, safety, and duration of construction projects, it has no right to control i the other key issues. Especially the implementation of fiscal consolidation pays
您可能关注的文档
最近下载
- 人教版(新插图)五年级上册数学全册教学课件.pptx
- 《机械制图与CAD绘图》课件——剖视图.pptx VIP
- TEAC V-970X_R-919X三磁头卡座维修手册.pdf
- 03S402 室内管道支架及吊架.docx VIP
- 体例格式6:工学一体化课程《windows服务器基础配置与局域网组建》任务7学习任务分析表.docx VIP
- 【初中生物】光合作用第一课时 2024--2025学年北师大版生物七年级上册(2024版).pptx VIP
- 高标准农田高效节水灌溉工程建设项目建议书.pdf VIP
- 统编版(2024新版)七年级上册历史必背知识点提纲详细版 .pdf VIP
- SL 228-2013 混凝土面板堆石坝设计规范.pdf VIP
- 个人简历表格下载word(最新).pdf VIP
原创力文档


文档评论(0)