徐家汇地铁站深基坑降水数值模拟与沉降控制.pdf

徐家汇地铁站深基坑降水数值模拟与沉降控制.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
11 TU375.4 A 2011 (1964 )E-mail: nq.zhou@mail.tongji.edu.cn Numerical simulation of deep foundation pit dewatering and land subsidence control of Xujiahui Metro Station 1 2 3 1 ZHOU Nian-qing , TANG Yi-qun , LOU Rong-xiang , JIANG Si-min 1. Department of Hydraulic Engineering, Tongji University, Shanghai 200092, China; 2. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 3. Shanghai Guanglian Construction Development Co., Ltd., Shanghai 200438, China Abstract: The buried depth of groundwater level is fairly shallow in Shanghai, and pit dewatering measures are mostly adopted in construction of metro stations. This study refers to the deep foundation pit dewatering project of Xujiahui Station of Shanghai Metro Line No. 11. According to the site conditions of engineering geology and hydrogeology, design depth of enclosure structure and pit excavation of metro station, a numerical model of groundwater seepage is established. Through the inversion of permeability parameters based on the field pumping tests, the three-dimensional finite difference method is used to simulate the pit dewatering considering the initial and boundary conditions. The numerical results are consistent with the actual monitoring data of groundwater level. At the same time, the land subsidence induced by dewatering is calculated. The results indicate that the land subsidence around the pit can be controlled effectively. Key words: Shanghai Metro; deep foundation pit; dewatering; numerical simulation; land subsidence

文档评论(0)

xiaozu + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档