安达信咨询方法与工具资料库ATPH1.DOC免费

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Central Data Repository System Test Plan Page PAGE15 of NUMPAGES 14 FILENAME UAT_PH1.DOC DATE3/10/95 Village Nine Leisure Intencity System User Acceptance Test Plan Last Edited: DATE 3/10/95 Central Data Repository DRAFT User Acceptance Test Plan Page PAGE2 of NUMPAGES 14 FILENAME UAT_PH1.DOC DATE3/10/95 Table of Contents TOC \o 1-1 Background GOTOBUTTON _Toc337376576 3 Test Goals Objectives GOTOBUTTON _Toc337376577 3 Approach GOTOBUTTON _Toc337376578 4 Test Environment GOTOBUTTON _Toc337376579 4 Test Team GOTOBUTTON _Toc337376580 4 Test Conditions and Data GOTOBUTTON _Toc337376581 4 Expected Results GOTOBUTTON _Toc337376582 5 Testing GOTOBUTTON _Toc337376583 5 CYCLE 1 - Pre Test Setup (DAY 1) GOTOBUTTON _Toc337376584 6 CYCLE 2 - Daily Tasks GOTOBUTTON _Toc337376585 7 CYCLE 3 - End of Shift GOTOBUTTON _Toc337376586 9 CYCLE 4 - End of Day Procedures GOTOBUTTON _Toc337376587 10 CYCLE 5 - Next Day Procedures (DAY 2) GOTOBUTTON _Toc337376588 11 CYCLE 6 - Miscellanous Procedures (DAY 3) GOTOBUTTON _Toc337376589 13 Background The Central Data Repository (CDR) is a custom built application designed to allow the collation and reporting of data from several of the modules within the Village Nine Leisure System. The general flow of data is from the point of sale and revenue applications and is downloaded into the inventory and Report Writer modules, and then downloaded into the financial system at head office. Test Goals Objectives The major objective of a User Acceptance Test Phase is to test the functionality of the system and to ensure it meets the requrements of the users. This includes reporting, type of data being held and the procedures associated with operating the system. This test phase does not cover the validation of the data as they are covered within the system test phase of the project. The test objectives are a

文档评论(0)

qinghe1 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档