南湖至大花岭联络线路基填筑施工试验段技术总结 [] : Mainly introduced the data collection , collation , analysis through the test section of the entire construction process , to determine a reasonable allocation of loose laying thickness 、the water content of construction control 、the compaction number of achieve compaction standard 、Rational allocation of machinery and personnel , in order to guide the full range of subgrade filling construction. [Keywords] : Test section 、Loose laying thickness 、 Water cont