赤峰风电公司发展策略分析.doc

  1. 1、本文档共34页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ABSTRACT Development and utilization of renewable resources is an important component of the national development strategy, tensions in the global energy situation, the global climate warming is a serious threat to the economic development and people life health today, all countries in the world to find new energy substitution strategy, to ensure the sustainable development and gain dominant position in the development of in the future. Environment warning Chinas emissions have very limited space, dont increase the share of clean energy and renewable energy, economic and social development in our country will be forced to slow down. Wind power, as one of the renewable energy has been a key of energy development in our country, nrenewable energy lawn promulgated since 2005, the proportion of wind power installed capacity in China, the rapid increase, as of the end of 2012 total installed capacity of 75945.2 MW wind, 7% of power grid, but with the rapid development of wind power, related problems have gradually exposed and seriously restricting the wind power industry development, such as: wind power development in the lack of overall planning, local government balkanised blind development; Wind power products manufacturing of excess capacity, market competition is intense, regardless of the benefits of big price war between enterprises, has entered a vicious cycle; Along with our country economic growth slowed, electricity demand fell, and wind power base in our country mostly in economic less developed areas, electricity demand is limited, local consumption ability is poor, ability is limited, to be delivered to the outside to abandon the wind phenomenon is serious, most of the wind power enterprise losses; The output of the power grid matching project construction lag behind, part of wind power project was built one year or even after 3-5 years cannot be put into operation, caused great waste Chifeng wind power company, founded in 2009 (hereinafter referred to as H

文档评论(0)

ggkkppp + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档