Kindly see the below response from our client for the comments mentioned in the inspection report. Please check the below details during the next visit.
=======================================
I have the following comments regarding the issues raised in the attached report. Inspection Finding ?????????Convection steel: drawing No.AJOH-N-ZD-CNV-0043 1/3 ? NORTH ELEVATION
Value on drawing
1575mm
Actual value
1587mm
Remarks This dimension is the width between columns, as shown below. If the width between the columns on the North end is 1587 - 1575 = 12 mm (1/2) too large, as long as th