黄河铁谢工程弯道改造刍议.pdfVIP

  • 0
  • 0
  • 约3.06万字
  • 约 11页
  • 2021-09-15 发布于重庆
  • 举报
Discussion about transformation of curve conduit of Yellow river Tie xie project Liu you zhan ( western he nan Yellow River Affairs Bureau) Abstract: Tie xie project was passively built due to rush to deal with emergency, it is separated to two up-down bend in north gate dam (number 10 dam). Until last 70 centuries, stuff and descend projects were respectively built in up and down the dam. Though the building of projects cann ’t transport downstream the 10 dam, it was suited to temporal water-sediment conditions, the river was in a perfect condition. After the “〞 flooding, the Tie xie project ’s inflow point ascend continually, since the project didn ’t develop a integrate smooth bend and water-sediment conditions are changing, the disadvantage river conditions that Lu cun project is near river began to appear. To settle Tie xie project transport effectively, the emphases of project bend is how to improve 入溜 conditions ,make stuff project complete, make project a intact smooth bend and use riverbed dredge up to improve inflow, stream guidance and outflow conditions of riverbed project. Key words: Tie xie project; bend; fluctuating river; river regulation; Yellow river 1 the questions put forward Yellow river Tie xie project is between Bai he and Hui meng country ,Meng jin county, 24km downstream xiaolangdi dam, south bank of Yellow river, it is up to Bai po project and down to Lu cun project, 7.45km total lengths. Tie xie project is in initial sections downstream Yellow river, it plays a important role in controlling flood and river circumstances. In a long time, because Tie xie project ’s plane condition is not smooth, outlet flow is unsteady, often swings in about 2 km near Lu cun project, this make the river circum

文档评论(0)

1亿VIP精品文档

相关文档