- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Simple Project (2) Phases: Product Development Phase Implementation Phase * ppt课件 Other Projects (12) Phases: Inception Feasibility Outline Proposal Scheme Design Detail Design Production Information Bill of Quantity Tender Action Project Planning Operating on Site Completion Feedback * ppt课件 Decision Points At the completion of each phase: Decision Point (gateway) Proceed to Next Phase Review Progress Forthcoming Actions Identified Assessment of Project Risks * ppt课件 Decision Points “Must have clear criteria of passing.” * ppt课件 Effect of Project Phase on Risk工程项目阶段面对的风险 “They wouldn’t Happen to Me!” * ppt课件 Effects: Management of Risk is a continuous process. Project Risks are DYNAMIC – change continuously. Regular risk assessments shall be done within the phases. Updated risk management information can assure efficient management and effective decision making. * ppt课件 Effects: Phase Changes Nature of Risk Changes Engineering Changes Changes need to be reflected in the estimations * ppt课件 Nature of Risk in Each Phases: Initial – Type, Size, and Location Detail Engineering – Realistic cost forecast, Detail design choices, program for best value (Value Engineering), Function at minimum cost. Implementation – Procurement, shipping time. Construction – Quality management. Decommissioning – Disposal of asset (including toxic substances) * ppt课件 Each phase has number of key assumptions: Assumptions Change Reassess Do the project still meet the BASIS? Any Impacts? Any New Risks? * ppt课件 Other Impacts: Risks should diminish as project progress. Risks that will no longer happen shall be removed. Project are not always continuous due to funding problems, market changes and others. Fast track projects – compress the normal project phases and cause phases overlapping each other. * ppt课件 Project Appraisal工程项目评估 “Project Objectives must be clear!” * ppt课件 Project Appraisal: “Project appraisal is a progress defining the different options t
文档评论(0)