英语日常用语——工艺管道
PROCESS PIPING
1 The design of the process piping is performed directly on
a model of the project.
工艺配管的设计是直接按照工程项目的一个模型完成的。
2 The model is an actual working tool for piping.
模型是配管用的实际工具。
3 Piping erection work include: prefabrication, placing,
aligning, welding and bolting.
管道安装工作包括 : 预制加工、安置、对准、焊接和连接。
4 Our piping prefabrication workshop covers a total area of
1000m2.
我们的管道预制加工厂拥有一千平方米的面积。
5 We can perform the pipe by following operations: cutting
and mechanical chamfering, manual and automatic welding.
我们可以对管子进行下列预制加工 : 切割和机械加工坡口 , 手工和
自动焊接等。
6 The computer generates isometric drawings and prints out
bill of materials.
计算机绘出管道空视图 , 并打印出材料明细表。
7 We shall complete the manhour requirements for the site
fabrication (site erection ) of this drawing.
我们将制订这张图纸现场制作 ( 现场安装 ) 所需的工时条件。
8 Seamless steel tube is made in sizes for 1/8 to 24 inches.
无缝钢管制作的尺寸从八分之一寸到二十四寸。
9 Spiral-welded steel pipe is available in sizes from 6 to
36 inches.
螺旋焊接钢管的尺寸从六寸到三十六寸。
10 Two types of end are standard on steel pipes and fittings,
that is flanged and screwed.
钢管和管件有两种标准端部型式 , 即: 法兰和丝扣。
11 This pipe is made of carbon steel (stainless steel ,cast
iron, plastic). 这管子是碳素钢 ( 不锈钢、铸铁、塑料 ) 制成的。
12 We usually use elbow (bend, flange, tee, reducer ) as a
kind of pipe fitting.
我们常用弯头 ( 弯管、法兰、三通、大小关 ) 作为一种管件。
13 What is the installation elevation of this pipeline?
这条管线的安装标高是多少 ?
14 This pipeline will be installed on the No.8 pipe rack .
这条管线将安装于八号管廊架上。
15 The transfer medium in this pipeline is liquid ammonia
(process air , soft water, alkali liquor, acidic gas).
这条管线的输送介质为液氨 ( 工艺空气、软水、碱液、酸性气体
您可能关注的文档
最近下载
- 2025年广西执法考试题及答案.doc VIP
- 2025年春新课程能力培养七年级数学下册人教版答案.pdf VIP
- 《常见淡水鱼病的诊断及防治》课件.ppt
- 《中国结课件》课件.ppt VIP
- 《药品营销心理学》课程标准.docx VIP
- 干股(虚拟股)分红协议书--最全最标准.doc VIP
- 港澳台华侨生入学考试物理试题真题及答案(2025年).docx VIP
- 2025年春基础训练九年级化学下册人教版答案.pdf VIP
- 2022年-2024年青岛卫健委事业编护理笔试真题.docx VIP
- 建筑工程图集 13SG903-1:混凝土结构常用施工详图(现浇混凝土板、非框架梁配筋构造).pdf VIP
原创力文档

文档评论(0)