- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工合同中英文模板
资料可以编辑修改用法资料可以编辑修改用法资料可以编辑修改用法致力于数据挖掘,合同简历、论文写作、PPT设计、方案书、策划案、学习课件、各类模板等方方面面,打造全网一站式需求主要经营:网络软件设计、图文设计制作、发布广告等,公司秉着以优质的效劳对待每一位客户,做到让客户满足Con structi on Con tract工程合同PO No.: XXXXXXXBuyer:. 甲方:Date of sig nature: 签约日期:Seller:乙方:This Purchase Order is made by and betwee n the Buyer and the Seller: Whereby the Buyer agrees to buy andthe Seller agrees to sell the under mentioned commodity according to the terms and conditions stipulated below:甲乙双方经友好协商,全都就供给以下产品,达成如下条款:1. Scope of Supply and Price工作范围及价格明细Seller shall carried out the con structi on in strict accorda nee with the Nati onal Sta ndard and the requireme nts stipulated in the Technical Agreement No. ________ which both party signed (see attached documents). Thewarranty period shall be 1 year after placeme nt of Goods in service.技术要求、质量要求、技术标准和质保期限:按国家标准和双方签定的技术协议(编号:_______________ 见附件)施工,质保期为投产后1年。3. Job Sites:施工地点:4. Con structi on Equipme nt, Tools Seller should providereas on able protecti on and in sura nee for its pers onnel safety. All the pers onnel injury and property damage caused by Seller failure of man ageme nt shall be borne by Seller.现场施工人员管理由乙方负责。乙方应对人员的平安等方面供应合理的保障,由于乙方管理缘由造成的人身伤亡及财产损失由乙方担当。5. Con structi on Time, delay and Postp one合同工期、工期延误、工期顺延:(1) Buyer shall issue a Notice to Seller about the con structi on one week prior the date of the con structi onstart.甲方提早一周通知乙方施工时间。(2) Construction period will be 15 days from the date of issuanee of the order to commenee the construction from Buyer.自甲方发岀开工令之日算起,工程工期15天。(3) Con structi on period may be postp oned as Buyer agreed after he certified that the delay not caused by Seller.非乙方缘由造成工期延误,须经甲方确认后工期顺延。(4) The start time of the construction shall be subject to the order to commenee by Buyer. Seller shalluncon diti on ally follow the overall project schedule of Buyer. Buyer shall be en titled to evaluate and adjust Seller construction plan.开工时间以甲方开工令为准。乙方应无条件服从甲方的整体进度方案,甲方有权对乙方制定的工期支配进展审核、调整。(5) Li
文档评论(0)