3万吨城市污水处理厂SBR工艺设计毕业设计.docVIP

  • 28
  • 0
  • 约1.97万字
  • 约 72页
  • 2023-02-23 发布于江苏
  • 举报

3万吨城市污水处理厂SBR工艺设计毕业设计.doc

Design Description This design is 3 x 104 m3 / d city sewage treatment plant process design 2. T sewage treatment plant, according to local environmental protection department survey of water quality and water than other cities, the city of sewage treatment is mainly include COD, BOD 5, also has asked for nitrogen and phosphorus. Treated sewage back into the sewage plant on the east side of the receiving waters ou water eventually discharged into a river, the river to surface water environment quality standard (GB18918-2002) in the waters Ⅲ class function, effluent water quality should reach the town sewage factory wastewater discharge standard (GB18918-2002) level of B standard. According to design requirements, the high content of nitrogen and phosph in water, sewage disposal engineering at the same time of removal of BOD 5 and COD, Nitrogen phosphorus removal process is needed, at the same time, water volume small, the sewage treatment plant is adopted SBR sequencing batch acti sludge process, SBR is a kind of according to the way of intermittent aeration to operation of the activated sludge wastewater treatment technology, also known as sequencing batch type activated sludge process. Main structure of this process include grille, sewage pump room, aerated grit chamber, bio-p tank, SBR, contact disinfection pond, thickener and sludge dewatering machine room, etc. Sewage the sewage factory after barrier in the sewage pump room to ascend into fine entered the aerated grit chamber aeration settling, then enter the bio-p tank to hydrolysis acidification, the sewage reacts to SBR pool, and then enter the pool disinfection, disinfection of sewage meet water quality requirements, a back tank out of the water. SBR of excess sludge after sludge pump room asce into the mud collecting Wells, again into

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档