- 28
- 0
- 约1.97万字
- 约 72页
- 2023-02-23 发布于江苏
- 举报
Design Description
This design is 3 x 104 m3 / d city sewage treatment plant process design 2. T sewage treatment plant, according to local environmental protection department survey of water quality and water than other cities, the city of sewage treatment is mainly include COD, BOD 5, also has asked for nitrogen and phosphorus. Treated sewage back into the sewage plant on the east side of the receiving waters ou water eventually discharged into a river, the river to surface water environment quality standard (GB18918-2002) in the waters Ⅲ class function, effluent water quality should reach the town sewage factory wastewater discharge standard (GB18918-2002) level of B standard.
According to design requirements, the high content of nitrogen and phosph in water, sewage disposal engineering at the same time of removal of BOD 5 and COD, Nitrogen phosphorus removal process is needed, at the same time, water volume small, the sewage treatment plant is adopted SBR sequencing batch acti sludge process, SBR is a kind of according to the way of intermittent aeration to operation of the activated sludge wastewater treatment technology, also known as sequencing batch type activated sludge process. Main structure of this process include grille, sewage pump room, aerated grit chamber, bio-p tank, SBR, contact disinfection pond, thickener and sludge dewatering machine room, etc. Sewage the sewage factory after barrier in the sewage pump room to ascend into fine entered the aerated grit chamber aeration settling, then enter the bio-p tank to hydrolysis acidification, the sewage reacts to SBR pool, and then enter the pool disinfection, disinfection of sewage meet water quality requirements, a back tank out of the water. SBR of excess sludge after sludge pump room asce into the mud collecting Wells, again into
您可能关注的文档
- 2台29MW燃气热水锅炉安装施工技术方案.doc
- 3D虚拟试衣网站创业计划书.doc
- 4S店薪酬管理制度.doc
- 4S店员工工资提成方案.doc
- 5s常用表格格式.doc
- 5s检查评分表格.doc
- 5层框架结构办公楼计算书毕业设计.doc
- 10kv变配电所一次系统与设计.doc
- 20米T梁吊装工程方案.doc
- 21m跨厂房梯形钢屋架设计课程设计计算书.doc
- 浙江省温州市2024-2025学年七年级上学期语文期末考查卷.docx
- 精品解析:北京市建华实验学校2024-2025学年七年级下学期期中英语试题(原卷版).docx
- 精品解析:北京市通州区2024-2025学年七年级下学期期末考试英语试卷(原卷版).docx
- 精品解析:北京市回民学校2024-2025学年九年级上学期期中语文试题(解析版).docx
- 精品解析:北京市海淀区2025-2026学年九年级上学期期末语文试题(解析版).docx
- 精品解析:北京市东城区汇文中学2025-2026学年八年级上学期期中语文试题(原卷版).docx
- 精品解析:北京市回民学校2024-2025学年九年级上学期期中语文试题(原卷版).docx
- 精品解析:2024-2025学年广东省广州市从化区街口镇中心小学人教版五年级上册期中测试数学试卷(解析版).docx
- 精品解析:北京市通州区2024-2025学年七年级下学期期末考试英语试卷(解析版).docx
- 精品解析:北京市建华实验学校2024-2025学年七年级下学期期中英语试题(解析版).docx
原创力文档

文档评论(0)