You can protect the master plan from any automatic changes to master 排程 items in the near future by using a planning time fence. During the planning run, the system makes no automatic changes to 订单 proposals within the planning time fence (which is specifically determined for every master 排程 item). The system always dynamically 计算s the end 日期 of the planning time fence starting from the planning 日期. You specify how the system is to determine the lot size by 选择ing one of the lot-sizing procedures in the material master record. The system uses the result of the lot-size calculation as the 数量 f