2015版福特Q1现场审核表Draft-EN-CHS-Q1-Site-Assessment-Evaluation-Matrix-Dec2015.xlsVIP

  • 3
  • 0
  • 约14.67万字
  • 约 6页
  • 2023-11-24 发布于重庆
  • 举报

2015版福特Q1现场审核表Draft-EN-CHS-Q1-Site-Assessment-Evaluation-Matrix-Dec2015.xls

Sheet1 Revision log GYR Summary Page Q1 Assessment Evaluation Matrix Acronyms Instructions (System Failure Mode and Effects Analysis) SFMEA PVT (Plant or Product Vehicle Team) PEO (Product Engineering Office) For more information, refer to the AIAG Production Part Approval Process (PPAP) manual or the Statistical Process Control Manual (SPC) . II.4.5 II.5.1 II.5.2 II.5.3 II.5.4 II.5.5 II.6.1 II.6.2 PVA (Dock-To-Dock) (Build-To-Schedule) VO (Vehicle Operations) II.10.4 Element Sub-Element (0) RED sub-elements and (1) or more YELLOW sub-elements (1) or more RED sub-elements (0) RED sub-element

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档