- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Ways to schedule batch processes with kanban Pattern production +Predictable sequence, stability -Inflexible to changes during shift Sequence fixed, part time variable Part # Trigger Point Part Description Location Date Triggered Lot Size Tool # Machine # 8 hour cycle P1 P2 P3 P4 P5 P6 Part # Part # Part # Part # Part # Part # Full Empty Trigger Point Lot making with batch board +Visual control, shorter lots possible, info -Many cards per part #, requires discipline Triangle kanban +Single kanban to control, pressure to reduce C/O time -Fixed quantity unfixed time cases only Sample triangle kanban flow Inventory 1 Part # 15454 3 Emergency Delay OK Signal kanban rail 2 Current Next Batch Process Part # 15455 Part # 15456 15454 15455 15456 B C Note: Only 1 triangle kanban per part # is needed in this flow Triangle Kanban Part # Trigger Point Part Description Location Date Triggered Lot Size Tool # Machine # Short exercise - Steps for setting up triangle kanban* Step 1: Determine time available for changeover work. Step 2: Set the number of changeovers per day. Step 3: Establish a lot size for production. Step 4: Establish a trigger point for reorder. *Assumes part numbers have already been dedicated to run on certain machines Step 1: Determine time available for non-production work (1 machine*) Total 1-shift production time available (net breaks and lunch) 450 min. Number of shifts x 2 Time available for production on 1 machine 1 day = 900 min. Time required per day to meet average demand* - 703 min. Net time available for set up and changeovers per day = 197 min. * Taken from above chart on basic machine data Part # Average demand per day (pieces) Cycle time Per piece Required run time per day Average changeover time Average scrap rate 15487 200 40 sec. 136 min. 55 min. 1.5% 15488 300 45 sec. 228 min. 55 min. 1.3% 15489 500 40 sec. 339 min. 55 min. 1.5% 1,000 703 min. *The three part numbers dedicated to this molding
您可能关注的文档
最近下载
- 2024年广东省初中学业水平考试模拟地理试卷(一)课件.pptx VIP
- 广州洪德巷历史文化街区保护利用规划.pdf
- 广州市人民南历史文化街区保护利用规划(文本+图纸).pdf VIP
- 关于烹饪的策划书3.pptx
- WALL·E《机器人总动员(2008)》完整中英文对照剧本.pdf VIP
- LDT 99.13-2008 建设工程劳动定额市政工程-维修养护工程.docx
- 实验报告之spss频数分析.docx VIP
- 新教科版科学小学科学五年级下册全册教案(表格式,可打印).docx
- 2022年新改版教科版五年级上册科学全册教案教学设计(新整理版).doc
- 某小区高楼变频恒压供水系统设计.docx
文档评论(0)