- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Chapter 7 System Life Cycle Methodologies 7.2 The Systems Life Cycle (SLC) Methodology Recommended way of doing something An application of the systems approach to the task of developing and using a computer-based system Often called waterfall approach 7.2.1 Phases in the SDLC 1) Planning 2) Analysis 3) Design 4) Implementation 5) Use The System Development Life Cycle (SDLC) SDLC is the phrase that encompasses the planning, analysis, design, and implementation phases of the system life cycle Who participates IS personnel User Information specialists can consult Traditional Information specialists working with users. A new strategy: Outsourcing 7.2.2 Life Cycle Management An upward migration Executive responsibility MIS steering committee Functions Set policy Control the purse strings Resolve conflicts Main Advantages of the Steering Committee Total firm support Projects will be characterized by good planning and control Establishes policies, provides fiscal control, and resolves conflicts 7.3 Planning Phase Benefits Define scope of the project Spot potential problems Arrange tasks in sequence Provide basis for control 7.4 Steps 1. Recognize problem (the trigger) 2. Define problem 3. Set objectives 4. Identify constraints Steps (cont.) 5. Conduct feasibility study (TENLOS) Technical Economic return Noneconomic return Legal and ethical Operational Schedule Steps (cont.) 6. Prepare study project proposal Goes to MIS steering committee 7. Approve or disapprove (go/no go) Key questions? 1. Will the system accomplish its goals? 2. Is this the best way to go about it? Steps (cont.) 8. Establish a control mechanism Think in terms of: 1. What 2. Who 3. When (Person-months versus calendar months) PERT and CPM network diagrams A Project Schedule Project Schedule (cont.) 3. Identify input data Systems analyst 0.50 requirements DBA 4. Prepare new system Systems analyst 2.00 documentation 5. Design ne
文档评论(0)