供应链管理(英文课件)Chapter6-Supply Contracts.pptVIP

供应链管理(英文课件)Chapter6-Supply Contracts.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
* Appropriate Mix of Contracts How much to commit to a long-term contract? Base commitment level. How much capacity to buy from companies selling option contracts? Option level. How much supply should be left uncommitted? Additional supplies in spot market if demand is high * Appropriate Mix of Contracts Hewlett-Packard’s (HP) strategy for electricity or memory products About 50% procurement cost invested in long-term contracts 35% in option contracts Remaining is invested in the spot market. * Risk Trade-Off in Portfolio Contracts If demand is much higher than anticipated Base commitment level + option level Demand, spot market. The worst time to buy in the spot market Prices are high due to shortages. * Risk Trade-Off in Portfolio Contracts A trade-off level between price risk, shortage risk, and inventory risk: For the same option level, the higher the initial contract commitment, the smaller the price risk but the higher the inventory risk. The smaller the level of the base commitment, the higher the price and shortage risks due to the likelihood of using the spot market. For the same level of base commitment, the higher the option level, the higher the risk assumed by the supplier since the buyer may exercise only a small fraction of the option level. * Risk Trade-Off in Portfolio Contracts Low High Option level Base commitment level High Inventory risk (supplier) N/A* Low Price and shortage risks (buyer) Inventory risk (buyer) *For a given situation, either the option level or the base commitment level may be high, but not both. * * Chapter 6: Supply Contracts * Dr. YANG Ruina * * Agenda Introduction Contracts for Strategic Components Contracts with Asymmetric Information Contracts for Nonstrategic Components * Introduction Significant increase of outsourcing -- From complete manufacturing to the design and assembly of the entire products More outsourcing has meant Search for lower cost manufacturers Development of design and manuf

文档评论(0)

别样风华 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档