铁路论文;ES-RAY(英文).pdfVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
EMERGENCY RE-CONSTRUCTION OF THE CONWY VALLEY LINE EMBANKMENT Dr M J Raybould I M Shelley Scott Wilson Geotechnics Royal Court Basil Close Chesterfield, S41 7SL, UK matthew.raybould@, ian.shelley@ KEYWORDS : Railway Earthworks, Emergency Works, Flood Damage, Embankment Remediation, Climate Change. INTRODUCTION Heavy rainfall in the Conwy Valley on 3rd and 4th February 2004 caused very high discharges in the River Conwy and led to overtopping and breaching of existing Environment Agency flood defence banks. Significant damage occurred to sections of the railway embankment that carries the Conwy Valley Railway Line (a bi-directional line carrying mostly passenger trains) near to the town of Llanrwst. The damage was principally concentrated in two sections of 2.5 to 3.5 m high railway embankment approximately 1350 m and 1200 m long respectively, resulting in some areas of embankment being completely washed away, leaving the track suspended in mid-air. The repair strategy was to excavate the failed sections of earthwork and rebuild the embankment with well-graded locally sourced limestone granular fill and protect the re-built embankment with rip-rap scour protection comprising high quality Penmaenmawr diorite. The unsuitable excavated materials arising on site were reused to provide additional flood protection. Flood relief culverts (up to 1800 mm diameter) were installed to reduce the risk of future overtopping of the embankment. Site remedial works commenced within 1 week of the floodwaters receding. Full time site supervision enabled preliminary designs to be modified, as dictated by the actual condi

文档评论(0)

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档