A self assembling curtain wall system.pdf
24th International Symposium on Automation Robotics in Construction ISARC 2007 24th International Symposium on Automation Robotics in Construction ISARC 2007 Construction Automation Group, I.I.T. Madras
Construction Automation Group, I.I.T. Madras A SELF-ASSEMBLING CURTAIN WALL SYSTEM Frans van Gassel Pascal Schrijver Construction Management and Engineering Building Technology Technische Universiteit Eindhoven Technische Universiteit Eindhoven PO Box 513, 5600 MB Eindhoven The Netherlands The Netherlands f.j.m.v.gassel@bwk.tue.nl
ABSTRACT
Robots are only incidentally used to assemble wall panels in high-rise buildings, even though robotic
technology is available for various applications. These applications can improve construction site safety
and increase the productivity of the assembly process. A research project initiated at Eindhoven University
of Technology TU/e in the Netherlands aims to develop an integral design for a curtain wall. The curtain
wall’s assembly, disassembly and user functions are integrated into a single concept. The focus lies on the
assembly/disassembly process and the use of new robotic technology.
This paper presents the further results of a concept design based on the requirements found in an earlier
survey of currently available strategies for the assembly of curtain wall systems. The purpose of this
research project is to explore the limits of currently available robotic technology in designing a curtain wall
for its entire life cycle by integrally designing a feasible concept.
KEYWORDS
Curtain Wall System, Wall Panels, Robot Technology, Construction Site Safety
1. INTRODUCTION ? Safe construction site for assembly workers.
As a rule, the conditions under which the panels of ? Curtain wall is appropriate for high-rise
a curtain wall system for high-rise buildings are constructions involving a steel load-bearing
assembled and
您可能关注的文档
- 4-3A strategic capacity allocation model for a complex supply chain.pdf
- 4-CRM系统新数据源接入项目分项合同(易九州).doc
- 4. Chemical equilibrium.ppt
- 4.2 Linux5.4下安装Db2数据库.docx
- 4.2 计算机数控(CNC)系统.ppt
- 4.宏为世纪IT培训_二级C语言模拟试卷4.doc
- 4053.高等学校教材:Visual Basic程序设计教程.pdf
- 4065.高等学校教材:Visual Basic程序设计教程实验指导与测试.pdf
- 4068.教育部职业教育与成人教育司推荐教材:C语言程序设计(第2版).pdf
- 4097.Visual FoxPro9.0程序设计教程.pdf
- 《GB/T 21561.1-2025轨道交通 机车车辆 受电弓特性和试验 第1部分:机车车辆受电弓》.pdf
- 《GB/T 6346.2301-2025电子设备用固定电容器 第23-1部分:空白详细规范表面安装金属化聚萘二甲酸乙二醇酯膜介质直流固定电容器 评定水平EZ》.pdf
- 2026年中国城市建设史复习题200道含答案(基础题).docx
- 2026年注册会计师(CPA)考试题库200道及1套参考答案.docx
- 60103交通事故案卷文书 标准 ga 40-2018.pdf.pdf
- 小升初衔接第一讲:基础词汇与句型综合梳理与运用(基于Starters 14).docx
- 四级公路设计关键要素教学课件.pptx
- Unit7SectionA2a-2e课件鲁教版英语六年级下册.pptx
- 初中地理八年级:探秘台湾省环境与经济协同发展.docx
- Unit2Success单元重点单词单句写作练习课件-北师大版高中英语选择性(1).pptx
原创力文档

文档评论(0)