- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
IssueReport-ManagementPlaza.doc
PRINCE2?- Issue Report
Project Name: Date: Release: Draft/Final Author:
Owner:
Client:
Document Number:
Note: This document is only valid on the day it was printed
Revision History
Date of next revision:
Revision Date Previous Revision Date Summary of Changes Changes Marked
Approvals
This document requires the following approvals. A signed copy should be placed in the project files.
Name Signature Title Date of Issue Version
Distribution
This document has been distributed to:
Name Title Date of Issue Version
Overview
Purpose An Issue Report is a report containing the description, impact assessment and recommendations for a request for change, off-specification or a problem/concern. It is only created for those issues that need to be handled formally.
The report is initially created when capturing the issue, and updated both after the issue has been examined and when proposals are identified for issue resolution. The Issue Report is later amended further in order to record what option was decided upon, and finally updated when the implementation has been verified and the issue is closed.
Contents The Issue Report should cover the following topics.
Issue Report 3
Note: this is a default template format, please check with the Configuration Management Strategy for precise format and composition requirements
Advice The Issue Report is derived from the: Highlight Report(s), Checkpoint Report(s) and End Stage Report(s); Stage Plan together with actual values and events; Users and supplier teams working on the project; The application of quality controls; Observation and experience of the processes; Quality Register, Risk Register and Lessons Log; and Completed Work Packages.
The Issue Report can take a number of formats, including: Document, spreadsheet or database; Entry in a project management tool.
Not all entries in the Issue Register will need a separately documented Issue Report.
The fo
您可能关注的文档
- DigitalWatermarking-InterimReport-TheUniversityofTexasat.ppt
- Disabilityreportsamples-Unum.ppt
- DischargeMonitoringReports.ppt
- DiscoveryofaFatherBySherwoodAndersonLessonTwoNEXT.ppt
- DisputesaboutGoogleMaps.doc
- doc-东南大学.doc
- doc-衡东县欧阳遇实验中学.doc
- DoctoralRefereeReports-UniversityofAuckland.doc
- DoctoralStudentProgressReporttoDPRC(Semester)-AIT.doc
- DocumentLinks.doc.doc
- 金融产品2024年投资策略报告:积极适应市场风格,行为金融+机器学习新发现.pdf
- 交运物流2024年度投资策略:转型十字路,峰回路又转(2023120317).pdf
- 建材行业2024年投资策略报告:板块持续磨底,重点关注需求侧复苏.pdf
- 宏观2024年投资策略报告:复苏之路.pdf
- 光储氢2024年投资策略报告:复苏在春季,需求的非线性增长曙光初现.pdf
- 公用环保2024年投资策略报告:电改持续推进,火电盈利稳定性有望进一步提升.pdf
- 房地产2024年投资策略报告:聚焦三大工程,静待需求修复.pdf
- 保险2024年投资策略报告:资产负债匹配穿越利率周期.pdf
- 政策研究2024年宏观政策与经济形势展望:共识与分歧.pdf
- 有色金属行业2024年投资策略报告:新旧需求共振&工业原料受限,构筑有色大海星辰.pdf
文档评论(0)