变电站毕业设计_外文翻译毕业设计论文
Reliability modelling and analysis for Sheffield Substation 220 kV upgrade project
Caroline Lee Transend, Networks Pty Ltd , Tasmania
Dr Sudhir Agarwal, San Diego, California, USA
ABSTRACT
This paper describes the application of a defensible probabilistic process in reliability evaluation for Sheffield 220 kV Substation redevelopment project. Sheffield Substation is a hub of 220 kV transmission system in the North and North-West regions of Tasmania. It provides connection to West Coast and Mersey Forth hydro power stations and facilitates power transfers from these power stations to major industrial customers in George Town area and retail andindustrial loads in the North and North-West regions of Tasmania. Therefore, it is important that integrity of Sheffield Substation is protected as much as possible and consequences of unplanned outages minimised to prevent possible widespread system disturbances.Together with General Reliability from San Diego,California, Transend undertook the reliability evaluation of four redevelopment options for Sheffield Substation using SUBREL, substation reliability and TRANSREL, transmission system reliability programs.
1.INTRODUCTION
Transend, as a Transmission Service Provider and Transmission Network Operator in Tasmania is responsible for providing reliable electricity supply and providing cost effective development solutions of the transmission network. Transend has identified a need for a comprehensive and more objective process in justification of development projects from its capital works program. The need to combine customer reliability targets and economics to achieve cost effective development solutions has been long recognised. A hierarchical framework for overall power system reliability evaluation is presented in [1].Different design, planning and operating principles and techniques have been developed in different countries over many decades in an attempt to find balance between reliability targets and econo
您可能关注的文档
最近下载
- Xikong西莱克低温机控制板SHXK814用户手册.pdf
- 爱迪生牛顿大发明攻略.doc VIP
- 重庆天齐锂电新材料有限公司新建1000吨_年高能锂电材料电池级金属锂项目环评报告.pdf VIP
- 朗文3A复习资料及垃圾分类作文8篇.doc VIP
- DB65T 3694-2015 现行哈萨克文与西里尔哈萨克文编码字符转换规则.docx VIP
- TGXAS 1044-2025《中医护理三级查房规范》(发布稿).pdf VIP
- 华为云服务登录.doc VIP
- 采砂场工业用水水资源论证论证表详解.doc VIP
- Onkyo安桥TX-NR828中文说明书.pdf
- 采砂场工业用水水资源论证论证表分析报告.doc
原创力文档

文档评论(0)