dependingontheproposedscopeofwork,followingare.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
dependingontheproposedscopeofwork,followingare

Table of Contents Adjoining Landowner Notification 2 Citizen Monitoring 2 Collection of Baseline Data 2 Community Outreach 3 Compile Data from Previous Studies 4 Construction 4 Construction (specific project example) 5 Design Plans and Specifications 6 Design Watershed-Based Land Use Planning Process 7 Outreach and Technology Transfer 8 Photo Monitoring Program 9 Preliminary Engineering (specific construction project example) 10 Project Planning (specific project example) 11 Public Meetings 11 Public Outreach 12 Public Outreach (specific project example) 12 Public Outreach (specific project example) 13 Technical Advisory Committee (TAC) 13 Water Quality Monitoring and Performance Measurement (specific project example) 14 Watershed Analysis 16 Watershed Management Plan 17 Watershed Management Workgroup 19 Workshops/Tours 19 Adjoining Landowner Notification Notify landowners who own property adjoining the project area. a. Landowner notification of this project shall be conducted through outreach efforts by participating stakeholders and also by e-mail and publication in local newspapers of general circulation. b. Upon completion of the notification required, submit documentation of outreach efforts along with a copy of any e-mail or newspaper article to Grant Manager. Citizen Monitoring The scope of work for citizen monitoring should include: a. Citizens recruited by (solicitation letters/notices/ personal invitation, etc.). Provide the Grant Manager documentation of the method used (flyers, letters, e-mails, etc.) to recruit citizens and a list of participating citizens. b. Training will be provided for participating citizens (when and how many sessions) using training materials (existing materials, materials that will be developed). Provide the Grant Manager a copy of the training sign-in sheets. c. Work with Clean Water Team (meet with representative of State Water Board Clean Water Team to discuss the Citizen Monitoring). Notify Grant Ma

您可能关注的文档

文档评论(0)

guanjie8song + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档