DimuonForwardSpectrometerMay2008CosmicRun.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
DimuonForwardSpectrometerMay2008CosmicRun.ppt

Dimuon Forward Spectrometer May 2008 Cosmic Run General Planning muon tracking has to run in a dedicated trigger class with muon trigger and V0 : trigger send by muon trigger test stability test calibration trigger mixed with physics trigger run with pulser (600Hz) from muon triger DAQ/TRIGGER (cluster of detectors triggered by different trigger classes) tests week 15 Planning run with St1, St2 and Ch5 (ventilation and temperature probes is mandatory) include part of St4 or St5 ?! station 9 is the candidate To do list LC2 installation : do not overwrite the files in the $LC2_CONFIG go to a new directory /opt/daq-MCH/ECS/ Trigger dispatching crate : missing kernel (Anton ?) user interface vs smi CROCUS software upgrade Finish the DA/script for calibration… Probably a full revision of the DCS FSM is necessary ; it will imply some work on the ECS side as well. “Long term thinking” to have a safe operating procedure for the muon spectrometer. → St1 : ~45 manus and 1 patch bus to be changed → St2 : few manus to change, fix problem with crocus 2565 (backplane vs software ?) → St345 : check with Herve. To do list temperature probes in St3 pressure sensors in St 2 (the one for St1 is not responding properly, having the value from St2 could help to know if the problem come from the ELMB readout) → Need to finish MUON interlock (if ventilation goes off or gas stop flowing…) → HV trip problem : could it come from the gas purity ? This need to be check urgently !! → Send trigger PS back to Wiener. Ask them to check the problem detected by L.Wallet (bit rate transfer is not save when rack’s tunred off). + this PS sometimes switch off (apparently because of a over/under current) ; we still need to investigate the origin of this. Tuesday 8th April DCS intervention (network, racks powered down) of Monday 7th is still has still some effects... Status of the low voltage power suplies : some problems CH1R and CROCUS R are missing (still in germany) → A

文档评论(0)

381697660 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档