ppt课件-dikellaoffshore50mw.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ppt课件-dikellaoffshore50mw

Dikella Offshore Windfarm 50 MW Presentation August 2010 Rough technical-financial estimations Mean Wind velocity: 7,0-8,0m/sec Annual production (c.f=28,5%, Pinst:120MW): 300.000MWh/yr Price :150 [€/KWh] Annual income (prices 2010): €45mio/yr Construction cost: €360mio Financing Structure: 40% Loan, 25% Equity, 35% Subsidy Construction cost analysis Preliminary Financial Analysis * * Area of installation: Sea district 6km southwest of Dikella, 20km southwest of Alexandroupolis, Evros Prefecture, Thrace. Distance from coast: 3-5 km Capacity: 50MW (with potential for 70MW expansion) Number of W/T: 10 W/T size: 5MW WT Type: AREVA Multibrid M5000 Installation depth: 30-40m Connection Point: Ultra Height Voltage Substation of Nea Santa Connection Grid: - Submarine Middle Voltage (20 or 30KV) Cables to the coastal Substation (5Km) - Middle Voltage (20 or 30KV)/Height Voltage (150KV) Substation at a suitable place near the coast. - Underground Height Voltage (150KV) Cable to the Ultra Height Voltage Substation of Nea Santa (35Km) Project maturity: - Application to RAE (Regulatory Authority for Energy) Reg. Num. I-114032/01.06.2010 - Letter from DESMIE (Hellenic TSO) suggesting the Ultra Height Voltage of Nea Santa as connection Point. - License from civil-works directory of East Macedonia and Thrace Region for a floating metering-mast installation at sea. - Private Agreement and Quotation from CRES for installation of a the mast in the site of interest. - Quotation from local construction facility for construction, transportation, installation and maintenance of a floating met-mast carrying platform - Lobbying with DESMIE, RAE end local Authorities for the go-ahead movement. - Certified, one year long, Wind Data from two adjacent land-locations adequate for the Application in RAE and suitable for a preliminary Energy Study. - Inquiry from two reliable sources for conducting preliminary Energy Study. *

您可能关注的文档

文档评论(0)

heti94575 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档