Energy Aware Grid Global Workload Placement based on Energy基于能量感知的网格全局负载布局.pptVIP

Energy Aware Grid Global Workload Placement based on Energy基于能量感知的网格全局负载布局.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
* * * * * * * * * * * Chandrakant Patel, Ratnesh Sharma, Cullen Bash, Sven Graupner HP Laboratories Palo Alto Energy Aware Grid: Global Workload Placement based on Energy Efficiency Grid Computing New paradigm in distributed and pervasive computing for scientific as well as commercial applications. Based on coordinated resource sharing and problem solving in dynamic, multi institutional virtual organizations. Energy Aware Grid Objective: Build an energy aware grid. Problem: Thermal and energy management issues due to aggregation of computing, networking and storage hardware. Solution: Data center energy efficiency coefficients: Workload placement decisions will be made across the Grid, based on these coefficients. Provide a global utility infrastructure explicitly incorporating energy efficiency and thermal management among data centers. Cooling Issues Example : A data center, with 1000 racks, approximately 25,000 square feet. Requires 10 MW of power for the computing infrastructure. An additional 5 MW would be required to remove the dissipated heat. At $100/MWh, cooling would cost $4 million per annum. Data Center thermo-mechanical architecture Rows of racks with multiple air-cooled hardware. Presence of multiple air-conditioning units. Higher airflow rates required due to “slim servers” and “blade servers”. Problems in Data Center Cooling: Cooling at Chip Level 10% of total power Cooling at Data Center Level 50% of the total power Additional thermodynamic work for cooling. Non-uniform temperature and airflow patterns. The data center has no well defined boundaries. No control mechanism to dissipate high heat loads. Contributions of the paper Propose an energy-aware co-allocator that redistributes computing within the global network of data centers. Examine the methods for evaluating energy efficiency and thermal management parameters applicable to any data center cooling infrastructure. Globus resource management architecture Ian Foster, Carl Kesse

文档评论(0)

chenchend + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档