Engineering 100 Bridge Project University of 工程100桥工程大学.pptVIP

Engineering 100 Bridge Project University of 工程100桥工程大学.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Engineering 100: Bridge Project Group 6 (Team Bacardi) Jon Honari, Kevin Lam, Otis Chantharangsy, Ivee Ilao Presentation Outline Design Ideas Prototype Bridge Process Testing/Results Prototype Analysis Flaws Improvements Final Bridge Design Testing/results Final Results Graph Analysis Failures Conclusion Design Arch Design Proved to be strongest structure based on our research Base Flat and straight Supports Angle supports Evenly distributed force Prototype Design Prototype Process Arch Supports Road Connections Structural Reinforcements Prototype Process Prototype Analysis Flaws Uneven weight distribution Not supported where bridge met jig Ultimate reason for failure Weak road Sloppy design Unnecessary weight Prototype Flaws Final Design Excess weight was removed Top section was more reinforced Used wood glue instead of hot glue for the majority Made sure weight was distributed evenly Reinforced the legs where the bridge met the jig Added more supports Prototype vs. Final Design Final Design (Completed) Final Design Failure Final Analysis Overall, very good improvement Bridge weighed 0.59 lbs Bridge held 531.89 lbs Performance = Successful With more supports in the correct places we believe the bridge could hold much more weight We conclude… Spending more time on the construction yielded better results About 170% improvement High efficiency ratio Endures a high amount of pressure Lasts under consistent amount of low pressure First Bridge: .56 pounds, held 296.00 lb Final Bridge: .59 pounds, held 531.89 lb * * Prototype Testing/Results  Red: Excess Weight Green: Lack of Support Final Bridge Prototype Final Testing/Results Important joints were overlooked and were not supported correctly *

您可能关注的文档

文档评论(0)

chenchend + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档