A COMPARISON OF THREE OPTIMIZATION METHODS FOR SCHEDULING MAINTENANCE OF HIGH COST, LONG-LI.pdf
- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
A COMPARISON OF THREE OPTIMIZATION METHODS FOR SCHEDULING MAINTENANCE OF HIGH COST, LONG-LI
Proceedings of the 2002 Winter Simulation Conference
E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes, eds.
A COMPARISON OF THREE OPTIMIZATION METHODS FOR SCHEDULING
MAINTENANCE OF HIGH COST, LONG-LIVED CAPITAL ASSETS
Terry M. Helm
Steve W. Painter
W. Robert Oakes
Los Alamos National Laboratory
Los Alamos, NM 87545, U.S.A.
ABSTRACT
A range of minimization methods exist enabling planners
to tackle tough scheduling problems. We compare three
scheduling techniques representative of “old” or standard
technologies, evolving technologies, and advanced tech-
nologies. The problem we address includes the complica-
tions of scheduling long-term upgrades and refurbishments
essential to maintaining expensive capital assets. We con-
centrate on the costs of being able to do maintenance work.
Using a standard technology as the baseline technique,
Constraint Programming (CP) produces a 50-yr mainte-
nance approach that is 31% less costly. Genetic Program-
ming produces an approach that is 60% less costly.
1 INTRODUCTION
Simulation “is an established method” for assessing per-
formance capabilities and operational domains for a wide
range of industries (Splanemann 2001). Production and
production-related operations planners often turn to simu-
lation technologies to assist operators in dealing with com-
plex production requirements particularly in highly con-
strained environments (Wang and Handschin 1999).
Simulation technologies permit the planner/engineer to
quickly assess numerous operational alternatives represent-
ing useful solution domains that otherwise cannot be
“seen” (Contaxis et al 2000; Bretthauer et al 1998).
One of the most critical production-related decisions
facing industrial planners is when to do what. It is well
recognized, for example, that production effectiveness is
symbiotically dependent on timely maintenance as well as
on-time product delivery (Kelleher 1997). The ubiquitous
ent
文档评论(0)