网站大量收购独家精品文档,联系QQ:2885784924

Scope refers to the deep foundation pit engineering.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ScopereferstothedeepfoundationpitengineeringScopereferstothedeepfoundationpitengineering.doc

Scope refers to the deep foundation pit engineering, Template engineering and supporting system, Remove the lifting engineering and installation engineering, Demolition and blasting engineering, The scaffold project, And the construction administrative department under the state council or other relevant departments of the provisions of other engineering risk is bigger. 4. Specific to the requirements of project construction plan organization expert argumentation (1) of the panel. Panel members should by five or more to meet the requirements of relevant professional experts. Construction units, supervision units, construction units, survey, design units project technical director and related personnel to attend. This project cooperated-builing parties members shall not have experts discussion meeting. (3) after the implementation of the requirements on the experts demonstration 1) the construction unit should demonstrate report according to modify the perfect special construction scheme, and the construction unit technical director ( Construction general contracting, the construction general contracting unit shall, relevant professional contractors technical director signature), project director of technology Cheng, the construction unit project director, after being signed before to organize the implementation. Second, the construction plan of the establishment principle Scheme can satisfy the requirement of the engineering quality, safety, time limit for a project, and the cost of construction cost is low. Four, contents and main points of construction scheme Project description: 2. Compilation basis: 3. The construction procedures: 4. Construction methods: 5. Schedule: 6. Resource allocation plan: 7. Safety technical measures: 8. Quality management measures: 9. Construction layout: Five, the construction scheme optimization Choose the short time, good quality, material, reasonable arrangement of labor saving, low engineering cost. 1. The cons

文档评论(0)

ganqludp + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档